Orange County NC Website
Name: Ronald and Vivian King Page 4 <br />Address: 406 Split Rail Lane <br />City: Hillsborough, N.C. 27278 <br />Phone: 732-7313 <br />Date: May 1, 2007 <br />FLOOR COVERINGS: <br />MASTER BATHROOM: <br />3. Remove commode. Note; Rehabilitation Specialist to inspection floor before <br />floor covering is installed. Install %a" lauan plywood over the existing floor. <br />Remove closet doors and track for floor installation. Properly nail new <br />plywood to the existing floor. Locate framing members for proper nailing. <br />Contractor to nail floor with proper fasteners. <br />4. Prepare floor for vinyl. Fill all joints, seams, holes with fzller and sand <br />smooth. Install a new vinyl floor. The vinyl to cost not less than $ 14.00 <br />sq. yard. Install metal tz7m where vinyl meets carpet. Note: New vinyl <br />to be professionally installed. Install shoe inolding where vinyl meets all wail <br />and cabinets areas. Note: Install izew vinyl in the bathroom closet. <br />LAUNDRY/DINING ROOM: <br />1. Remove the existing vinyl in the laundry. and Dining room. Remove the <br />damaged sheathing/plywood to the framing mezxibers in the laundry room. <br />( Location- Washer /Dryer Area) Note: Rehabilitation Specialist to inspect <br />framing before new sheathing is installed. Install 5/8- 3/a" pressure treated <br />plywood in the laundry room. Nail plywood using galvanized nails. <br />2. Prepare the floor for %a" lauan plywood and a new vinyl Hoar. Install <br />'/a" lauan and a new vinyl floor. The vinyl to cost not less than $14.00 <br />sq. yard. Install wide metal trim where the new vinyl meets the existing <br />vinyl in the kitchen. Install shoe molding al all wall and cabinet areas. <br />Shoe molding to be either pre-finished or prime and painted. Fill all nail <br />holes and caulk properly. Note: Vinyl to be professionally installed. <br /> <br />