Browse
Search
Agenda - 08-21-2007-4n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 08-21-2007
>
Agenda - 08-21-2007-4n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:39:02 PM
Creation date
8/28/2008 11:03:03 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Document Type
Agenda
Agenda Item
4n
Document Relationships
Minutes - 20070821
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Ronald and Vivian King Page 4 <br />Address: 406 Split Rail Lane <br />City: Hillsborough, N.C. 27278 <br />Phone: 732-7313 <br />Date: May 1, 2007 <br />FLOOR COVERINGS: <br />MASTER BATHROOM: <br />3. Remove commode. Note; Rehabilitation Specialist to inspection floor before <br />floor covering is installed. Install %a" lauan plywood over the existing floor. <br />Remove closet doors and track for floor installation. Properly nail new <br />plywood to the existing floor. Locate framing members for proper nailing. <br />Contractor to nail floor with proper fasteners. <br />4. Prepare floor for vinyl. Fill all joints, seams, holes with fzller and sand <br />smooth. Install a new vinyl floor. The vinyl to cost not less than $ 14.00 <br />sq. yard. Install metal tz7m where vinyl meets carpet. Note: New vinyl <br />to be professionally installed. Install shoe inolding where vinyl meets all wail <br />and cabinets areas. Note: Install izew vinyl in the bathroom closet. <br />LAUNDRY/DINING ROOM: <br />1. Remove the existing vinyl in the laundry. and Dining room. Remove the <br />damaged sheathing/plywood to the framing mezxibers in the laundry room. <br />( Location- Washer /Dryer Area) Note: Rehabilitation Specialist to inspect <br />framing before new sheathing is installed. Install 5/8- 3/a" pressure treated <br />plywood in the laundry room. Nail plywood using galvanized nails. <br />2. Prepare the floor for %a" lauan plywood and a new vinyl Hoar. Install <br />'/a" lauan and a new vinyl floor. The vinyl to cost not less than $14.00 <br />sq. yard. Install wide metal trim where the new vinyl meets the existing <br />vinyl in the kitchen. Install shoe molding al all wall and cabinet areas. <br />Shoe molding to be either pre-finished or prime and painted. Fill all nail <br />holes and caulk properly. Note: Vinyl to be professionally installed. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.