Browse
Search
Agenda - 08-21-2007-4n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 08-21-2007
>
Agenda - 08-21-2007-4n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:39:02 PM
Creation date
8/28/2008 11:03:03 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Document Type
Agenda
Agenda Item
4n
Document Relationships
Minutes - 20070821
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Ronald and Vivian King ~ Page 2 <br />Address: d06 Split Rail Lane <br />City: Hillsborough, N.C. 27278 <br />Phone: 732-7313 <br />Date; May 1, 2007 <br />EXTERIOR: <br />2. Repair the damaged vinyl siding on the right side gable. Install matching <br />vinyl siding. <br />~$ <br />3. Caulk all small holes in the vinyl siding and vinyl trim. Contractor <br />shall use 100% white silicone caulk. AlI holes to be filled properly and <br />smooth. <br /> <br />4. Remove the decking boards and handrails from the front porch floor <br />and steps. Note: Only remove the Band-grip section of the hand rails. <br />Install new pressure treated 2x6 material for the floor acid steps. Install <br />2x4 pressure treated for the handrails. Contractor shall use galvanized <br />screws for new wood installation. <br /> <br />5. Replace the center stringer on the front porch steps. Install pressure <br />treated lumber. Properly nail stringer to the porch band and level <br />with existing end stringers. ~ <br />6. Remove four {4) steps heads from the side porch steps. Note: Refer <br />to Rehabilitation Specialist for boards to be removed. Install matching <br />pressure heated 2x61umber. Secure all loose boards and drive down all <br />exposed nails onside parch. <br />7. Prepare both front and side porches, steps and railings for paint. Remove <br />all loose paint. Prime with an oil based primer and apply two coats of <br />semi-gloss latex paint. Owner to choose color. <br />.$ <br />8. Repair the broken window on the right rear corner. Install matching <br />material ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.