Browse
Search
Agenda - 08-21-2007-4n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 08-21-2007
>
Agenda - 08-21-2007-4n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:39:02 PM
Creation date
8/28/2008 11:03:03 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Document Type
Agenda
Agenda Item
4n
Document Relationships
Minutes - 20070821
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Name: Ronald and Vivian Ding <br />Address: 406 Split Rail Lane <br />City: Hillsborough, N.C. 27278 <br />Phone: 732-7313 <br />Date: May 1, 2007 <br />ROOF & GUTTERS <br />1. Remove the existing shingle roof and felt paper to the sheathing. <br />Note: After existing roof covering is removed; if fin•ther damage is discovered <br />the Owner, Contractor and Rehabilitation Specialist will meet to review the work, <br />determine a course of action and, if necessary, a cost for any additional work. <br />Insta1130 lb felt paper, new white eve starter, vent boots, matching sky-liglrts and <br />25 year shingles. Refer to manufacturer specifications for shingle installation. <br />New felt paper shall be installed properly. Lace the valley and all felt paper to run <br />horizontally. ' <br />.$ <br />2. Remove the existing gutters and downspouts. Install seamless aluminum gutters <br />and downspouts. Note: All gutters and downspouts shall be installed properly. <br />All downspouts shall attach to solid drain file and shall discharge not Less than <br />15 feet front the foundation wall. Note: All drain file shall have positive drainage. <br />away from the unit. Contractor shall install extend drain file as necessary for <br />proper drainage. Refer to Rehabilitation Specialist for drain file discharge <br />location. Tiistall standard gutters and over-sized downspouts. Contractor to <br />install proper fittings for~over-sized downspouts into the drain file pipe, <br /> <br />Install aluminum gutters guards in all gutters. Note: Contractor to install <br />the gutters guards properly. Gutters guards to be installed under starter <br />shingle. <br />~$ <br />EXTERIOR: <br />1. Repair approximately 18' of damaged fascia on the center front and rear boxing. <br />Install matching thickness material- plywood or masonite etc. Install fascia using <br />galvanized nails. Prime new material with an oil based primer. Cover all fascia <br />and gable trun with white aluminum coil trim. Cover the gable soffit with solid <br />vinyl soffit. Install all necessary J-channel and utility trim to properly finish <br />boxing. Use proper nails far coil trim. (White) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.