Browse
Search
Agenda - 08-21-2007-4n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 08-21-2007
>
Agenda - 08-21-2007-4n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:39:02 PM
Creation date
8/28/2008 11:03:03 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Document Type
Agenda
Agenda Item
4n
Document Relationships
Minutes - 20070821
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Name: Ronald and Vivian King <br />Address: 406 Split Rail Lane <br />City: Hillsborough, N.C. 27278 <br />Phone: 732-7313 <br />Date; May 1, 2007 <br />PLUMBING: <br />Page 8 <br />4. Install a new faucet ou the hall bathroom sink. Install a premium grade <br />faucet. Make all plumbing connections. <br />S. Install a freeze proof water spigot on the rear of the unit. Refer to <br />Rehabilitation Specialist for proper location.. Make all plumbing <br />connections. New water spigot to be secure on unit. <br />7. .Service the septic tank. Contact a licensed septic pumping company <br />to pump both septic tanks. Note:.Owner or Rehabilitation Specialist <br />must be on site during this work. ~ $ <br />.$ <br />8. Install two (2) 24" towel bars in the hall bathroom. Refer to owner <br />for proper location. New towel bars shall be secure in wall. $ <br />GENERAL REPAIRS: <br />1. Repair the damaged wall comer between the kitchen and Laundry/ <br />Dining area. Repair the sheebrock and finish smooth. Install new corner <br />trim. Prime alid paint corner level with kitchen countertop. Prime and <br />paint new trim to match. <br />2. Repair the water stained ceilings around the existing sky-lights. <br />Remove all Loose and damaged ceiling texture and sheetrock. Re-install <br />and spray texture, Note: Trim maybe installed around opezung to cover <br />all joints and damaged sections. Note: Refer to Rehabilitation Specialist for <br />acceptable trim to be used. Prime and paint all new trim around sky lights. <br /> <br />3. Install a 6-mil vapor barrier in the crawlspace. Remove all debris <br />from ground before vapor barrier is installed. All poly to be clean <br />and installed flat on ground. $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.