Browse
Search
2016-188-E Solid Waste - SCS Engineers, PC for preparation of Solid Waste Financial Plan
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-188-E Solid Waste - SCS Engineers, PC for preparation of Solid Waste Financial Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:38:06 AM
Creation date
3/18/2016 10:53:30 AM
Metadata
Fields
Template:
Contract
Date
3/7/2016
Contract Starting Date
3/7/2016
Contract Document Type
Agreement - Consulting
Amount
$89,999.00
Document Relationships
2017-109-E SW - SCS Engineers, PC - Consent to void earlier contract
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-347-E SW - SCS Engineers for Consulting Services Scope of Services Performed
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-010-E Solid Waste - SCS Engineering Professional Consulting
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2016-188-E SW - SCS Engineers, PC for preparation of Solid Waste Financial Plan
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8A735669-3D2F-468A-BF99-3DF97688146A <br /> Proposal for Preparation of a Solid Waste Financial Plan <br /> The operational information needed will include: <br /> • Quantities of solid waste, recyclable materials, white good, HHW and other similar <br /> materials collected at the various Department solid waste facilities. We will use data <br /> supplied by the Department in its fiscal year budgets, but work with the Department <br /> to estimate the number of customers and tonnages delivered by customers. <br /> • Estimated costs for non-routine operational expenses for active and closed landfill <br /> units (e.g., emergency repairs to the cap, groundwater remediation, etc. for the <br /> Orange County Landfill. <br /> • County population and demographic data that would impact potential waste and <br /> recyclables flows to Department facilities. <br /> • Estimates of other State "landfill bans" as well as organic diversion initiatives and <br /> their impact on waste deliveries to Department facilities. <br /> Once this historical information has been gathered, SCS will analyze it to evaluate its <br /> reasonableness. This will be done by calculating operating and cost statistics for each respective <br /> service operations and measure it against benchmarking data collected by SCS in other similar <br /> solid waste system assignments. These data and information will be summarized in a series of <br /> diagrams and graphs. <br /> Deliverables for Task 2 <br /> A Task 2 Interim Report will be issued summarizing the results of the current system assessment, <br /> which will include: <br /> • A list of all landfill and non-landfill related services provided by the Department; <br /> • The approximate labor devoted to the services provided; <br /> • Evaluation of"indirect costs"which are paid by the Department to the County; <br /> • The extent to which Department personnel deliver other services not enumerated; <br /> • The total cost of providing landfill and non-landfill related services; <br /> • A review of the existing Solid Waste Program Fee ($107 per year); and, <br /> • A comparison of the best management practices related to optimizing revenue and <br /> expenses of peer jurisdictions. <br /> Task 3 — Cost for the Department to Provide Services <br /> Based on the current system assessment, SCS will estimate the costs for the Department to <br /> provide solid waste and recycling program services, administer non-landfill programs, and fund <br /> the other expenditures that the Enterprise Fund serves. The cost estimate will consider a 10-year <br /> term and will include labor and equipment that is necessary to provide the current service. The <br /> Pro Forma Model(refer to Exhibit 4)will provide a means to evaluate these costs. <br /> The cost-benefit analysis will include an estimate of the "revenue requirement"required to be <br /> paid by the assessment of the annual SWPF. It is the total amount of money the Department <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.