Browse
Search
2016-188-E Solid Waste - SCS Engineers, PC for preparation of Solid Waste Financial Plan
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-188-E Solid Waste - SCS Engineers, PC for preparation of Solid Waste Financial Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:38:06 AM
Creation date
3/18/2016 10:53:30 AM
Metadata
Fields
Template:
Contract
Date
3/7/2016
Contract Starting Date
3/7/2016
Contract Document Type
Agreement - Consulting
Amount
$89,999.00
Document Relationships
2017-109-E SW - SCS Engineers, PC - Consent to void earlier contract
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-347-E SW - SCS Engineers for Consulting Services Scope of Services Performed
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-010-E Solid Waste - SCS Engineering Professional Consulting
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2016-188-E SW - SCS Engineers, PC for preparation of Solid Waste Financial Plan
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8A735669-3D2F-468A-BF99-3DF97688146A <br /> Proposal for Preparation of a Solid Waste Financial Plan <br /> Table of Contents <br /> Section Page <br /> 1 Firm Description...................................................................................................................................... 1 <br /> 2 Relevant Experience and Similar Projects......................................................................................... 1 <br /> 3 Key Personnel Qualifications...............................................................................................................4 <br /> 4 Scope of Work —Approach................................................................................................................4 <br /> Objectives of the Proposed Study.......................................................................................................5 <br /> Scopeof Services...................................................................................................................................5 <br /> Task 1 — Project Kickoff Meeting and Collect Background Data.......................................b <br /> Deliverablesfor Task 1 ..................................................................................................b <br /> Task 2 — Current System Assessment........................................................................................7 <br /> Deliverablesfor Task 2.................................................................................................. 8 <br /> Task 3 — Cost for the Department to Provide Services.........................................................8 <br /> Deliverablesfor Task 3................................................................................................1 1 <br /> Task 4 — Comprehensive Report and Additional Presentations (Optional)................... 12 <br /> Task 5 — Alternative Scenario Iterations (Optional)........................................................... 12 <br /> Task b — Model Training (Optional)...................................................................................... 12 <br /> 5 Budgetary Fee Estimate.....................................................................................................................13 <br /> bProject Schedule...................................................................................................................................13 <br /> 7 Sample Work Products.......................................................................................................................13 <br /> List of Exhibits <br /> No. Page <br /> Exhibit 1. Selected SCS Solid Waste Financial Projects........................................................................ 2 <br /> Exhibit 2. Locations of Selected SCS Solid Waste Financial Analysis and Rate Study Projects....3 <br /> Exhibit 3. Typical Data/Information Requests.........................................................................................7 <br /> Exhibit 4. Illustrative Pro Forma Model Concept....................................................................................9 <br /> Exhibit 5. Examples of Types of Scenario Outputs From SCS Assignments.....................................10 <br /> Exhibit b. Orange County Solid Waste Financial Plan Cost Estimate.............................................0-1 <br /> Exhibit7. Project Schedule........................................................................................................................14 <br /> Appendix <br /> A Resumes <br /> B Project Profiles <br /> C Cost Estimate and Fee Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.