Browse
Search
1994 S Purchasing - Agreement between Orange County and Hakan/Corley & Associates, Inc. for renovation of Sheriff's offices
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1994
>
1994 S Purchasing - Agreement between Orange County and Hakan/Corley & Associates, Inc. for renovation of Sheriff's offices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 12:13:35 PM
Creation date
3/3/2016 12:13:26 PM
Metadata
Fields
Template:
BOCC
Date
8/23/1994
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
VIII-G
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> ARTICLE 1 hedule or construction budget, the Architect shal l pr <br /> fora val b1' the Owner, Design Developme ocuments <br /> ARCHITECT'S RESPONSIBILITIES consist ing o ings and other docume o fis and describe <br /> 1.1 ARCHITECT'S SERVICES the size and characte he Pro. as to architectural, struc- <br /> tural, mechanical and el -vstems, materials and such <br /> 1.1.1 The Architect's services consist of those services per- other elements as e appropriate <br /> formed by the Architect,Architect's employees and Architect's Architect shall advise the Owner of anv menu <br /> consultants as enumerated in Articles 2 and 3 of this Agreement t e preliminary estimate of Construction Cost <br /> and any other services included in Article 12 <br /> 1.1.2 The Architect's services shall be performed as expedi- 2.4 CONSTRUCTION DOCUMENTS PHASE <br /> tiously as is consistent with professional skill and care and the <br /> orderly progress of the Work. Upon request of the Owner,the 2.4.1 Based on the approved Design Development Docu- <br /> Architect shall submit for the Owner's approval a schedule for menu and any further adjustments in the scope or quality the Project or in the construction budget authorized by the of <br /> the performance of the Architect's services which may be <br /> adjusted as the Project proceeds, and shall include allowances Owner,the Architect shall prepare,for approval by the Owner, <br /> f <br /> for periods of time required for the Owner's review and for Construction Documents consisting of Drawings and Specica- <br /> tions setting forth in detail the requirements for the construe <br /> approval of submissions by authorities having jurisdiction over <br /> the Project. Time limits established by this schedule approved [ion of the Project. <br /> by the Owner shall not,except for reasonable cause,be exceeded 2.4.2 The Architect shall assist the Owner in the preparation of <br /> by the Architect or Owner. the necessary bidding information, bidding forms, the Condi- <br /> 1.1.3 The services covered by this Agreement are subject to dons of the Contract,and the form of Agreement between the <br /> the time limitations contained in Subparagraph 11 5.1 Owner and Contractor <br /> 2.4.3 The Architect shall advise the Owner of any adjustments <br /> ARTICLE 2 to previous preliminary estimates of Construction Cost indi- <br /> cated by changes in requirements or general market conditions. <br /> SCOPE OF ARCHITECT'S BASIC SERVICES <br /> 2.4.4 The Architect shall assist the Owner in connection with <br /> 2.1 DEFINITION the Owner's responsibility for filing documents required for <br /> the approval of governmental authorities having jurisdiction <br /> 2.1.1 The Architect's Basic Services consist of those desc 'bed over the Project. <br /> in Paragraphs 2.2 through 2 6 and any other services id rifled 1' <br /> in Article 12 as part of Basic Services,and include nor al struc- 2.5 BIDDING OR NEGOTIATION PHASE <br /> tural, mechanical and electrical engineering servic <br /> 2.5.1 The Architect, following the Owner's approval of the <br /> P' 2. SCHEMATIC DESIGN PHASE Construction Documents and of the latest preliminary estimate <br /> P� 2.2. he Architect shall review the progr furnished by the of Construction Cost, shall assist the Owner in obtaining bids <br /> Owner ascertain the requirements of e Project and shall or negotiated proposals and assist in awarding and preparing <br /> arrive at a tual understanding of su requirements with the contracts for construction. <br /> Owner <br /> 2.6 CONSTRUCTION PHASE—ADMINISTRATION <br /> 2.2.2 The Archite shall provi a preliminary evaluation of OF THE CONSTRUCTION CONTRACT <br /> the Owner's progr sch ule and construction budget <br /> requirements, each in to f the other, subject to the limita- 2.6.1 The Architect's responsibility to provide Basic Services <br /> tions set forth in Subpa h 5.2 1 for the Construction Phase under this Agreement commences <br /> with the award of the Contract for Construction and terminates <br /> 2.2.3 The Architect all revie with the Owner alternative at the earlier of the issuance to the Owner of the final Certificate <br /> approaches to desi and constru ' n of the Project. for Payment or 60 days after the date of Substantial Completion <br /> 2.2.4 Based o he mutually agreed-u n program, schedule of the Work,unless extended under the terms of Subparagraph <br /> and constru on budget requirements, e Architect shall 103 3 <br /> prepare, fo approval by the Owner, Schem 'c Design Docu- 2.6.2 The Architect shall provide administration of the Con- <br /> ments c sisting of drawings and other docum is illustrating tract for Construction as set forth below and in the edition of <br /> the sc e and relationship of Project components AIA Document A201, General Conditions of the Contract for <br /> 2. The Architect shall submit to the Owner a prel inary Construction, current as of the date of this Agreement, unless <br /> timate of Construction Cost based on current area,volum or otherwise provided in this Agreement. <br /> other unit costs. 2.6.3 Duties,responsibilities and limitations of authority of the <br /> 2. ESIG EVELOPMENT PHASE Architect shall not be restricted, modified or extended without <br /> written agreement of the Owner and Architect with consent of <br /> 2.3.1 Bas ve c n Documents the Contractor, which consent shall not be unreasonably <br /> an any adjustments authorized by the Owner in the pr withheld. <br /> AIA DOCUMENT 8141 •OWNER-ARCHITECT AGREEMENT• FOURTEENTH EDITION•AIA11 • ©1987 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE,N.W,WASHINGTON,D C.20006 6141-1957 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.