Orange County NC Website
Ms. Pamela Jones October 27 1993 <br /> RE: Sheriffs Office Renovation page 2 <br /> F. BASS, NIXON, KENNEDY, ENGINEERS <br /> (Mechanical/Electrical/Plumbing Design): $ 4,500 <br /> G. BNK CONSTRUCTION ADMINISTRATION: <br /> 1.5 mo. X 2 trips/mo'_ <br /> 3 trips @ $300/EA 900 <br /> Bass, Nixon, Kennedy Total Fee: $ 5,400 <br /> Total Hakan/Corley ($10,340) and BNK fee: $15,740 <br /> Items of Cost Not Included: <br /> 1. Printing, postage, reproduction (billed at cost) <br /> 2. Materials testing <br /> 3. Legal fees <br /> We bill on a monthly basis and payment is due by the 25th of the month of the date of the <br /> `invoice. <br /> We look forward to working with Orange County on this project. Please let us know if you have <br /> questions. <br /> Sin , <br /> enneth E. Redfoot, A. <br /> KER:esw <br /> hakan/coriey&associates,inc. <br />