Browse
Search
1994 S Purchasing - Agreement between Orange County and Hakan/Corley & Associates, Inc. for renovation of Sheriff's offices
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1994
>
1994 S Purchasing - Agreement between Orange County and Hakan/Corley & Associates, Inc. for renovation of Sheriff's offices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 12:13:35 PM
Creation date
3/3/2016 12:13:26 PM
Metadata
Fields
Template:
BOCC
Date
8/23/1994
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
VIII-G
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "B" <br /> hakan/corley & associates, inc. architects engineers planners <br /> October 27, 1993 <br /> Ms. Pamela Jones, Director <br /> Purchasing & Central Services <br /> County of Orange <br /> P. O. Box 8181 <br /> Hillsborough, NC 27278 <br /> RE: Proposed Renovation <br /> Orange County Sheriffs Office <br /> Hillsborough, NC <br /> PROPOSAL FOR PROFESSIONAL DESIGN SERVICES <br /> Dear Ms. Jones: <br /> Thank you for this opportunity to provide our fee for professional design services for the <br /> ,renovation of the Sheriffs Office. .. <br /> Based on approval of floor plans dated 10/27/93, we estimate the time and cost to produce the <br /> drawings and specifications and construction administration to be as follows: <br /> A. DEMOLITION DRAWINGS: i <br /> D-1: First Floor Plan 12 hrs. <br /> D-2: Second Floor flan 12 hrs. <br /> B. ARCHITECTURAL DRAWINGS: <br /> A-1 First Floor Plan 16 hrs. <br /> A-2 Second Floor Plan 8 hrs. <br /> A-3 First Floor Reflected Ceiling Plan 8 hrs. <br /> A-4 Second Floor Reflected Ceiling Plan 4 hrs. <br /> A-5 Finish schedules & details (cabinets, <br /> molding, etc.,) 24 hrs. <br /> A-6 Door/hardware schedules & details, <br /> toilet accessories, etc. 24 hrs. <br /> C. SPECIFICATIONS: 24 hrs. <br /> D. ADMINISTRATION/COORDINATION: 8 hrs. <br /> Total Design Time: 140 hours <br /> 140 hours @ $55/hour $ 7,700 <br /> E. CONSTRUCTION ADMINISTRATION (1-1/2 Mo. construction time): <br /> 1.5 mo. x 4 trips/mo = <br /> 6 trips x 6 hr/trip @ $60/hr.: 2,160 <br /> Shop drawing review: 8 hrs. @ $60/hr.: 480 <br /> Total Hakan/Corley Fee: $10,340 <br /> M.J HAKAN, P.E. BOX 2368, CHAPEL HILL, NC 27515-2368 19191 942-8586 KENNETH E. REDFOOT, A.I.A. <br /> GLENN D CORLEY, A.I.A. 121 S ESTES DR., #206 27514-2868 FAX 929-4802 MARK W. ZACK, A.I.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.