Orange County NC Website
i <br /> � 3 <br /> TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> ARTICLE 1 -heduIe "' construction budget, the Architect shall pr , <br /> fora 1al by the Owner, Design Develop <br /> me currents <br /> ARCHITECT'S RESPONSIBILITIES consisiing-orcmQngs and other docume o fix and describe <br /> the size and characte he Pro as to architectural. struc- <br /> 1.1 ARCHITECT'S SERVICES rural, mechanical and el vstems, materials and such <br /> 1.1.1 The Architect's services consist of those services per- other elements as e appropriate <br /> formed by the Architect, Architect's emplovees and Architect's 2,3.2 Architect shall advise the Owner of anv menu <br /> consultants as enumerated in Articles 2 and 3 of this Agreement a preliminary estimate of Construction Cost. <br /> and any other services included in Article 12 <br /> 1.1.2 The Architect's services shall be performed as expedi- 2.4 CONSTRUCTION DOCUMENTS PHASE <br /> tiously as is consistent with professional skill and care and the <br /> orderly progress of the Work. Upon request of the Owner,the men Based on the approved Design Development lily o <br /> Architect shall submit for the Owner's approval a schedule for menu and any further adjustments in the scope or quality of <br /> the performance of the Architect's services which may be the Project or in the construction budget authorized by the <br /> adjusted as the Project proceeds, and shall include allowances Owner,the Architect shall prepare,for approval by the Owner, <br /> for periods of time required for the Owner's review and for Construction Documents consisting of Drawings and Specifica- <br /> approval of submissions by authorities having jurisdiction over tions setting forth in detail the requirements for the construc- <br /> the Project. Time limits established by this schedule approved tion of the Project. <br /> by the Owner shall not,except for reasonable cause,be exceeded 2.4.2 The Architect shall assist the Owner in the preparation of <br /> by the Architect or Owner. the necessary bidding information, bidding forms, the Condi- <br /> 1.1.3 The services covered by this Agreement are subject to tions of the Contract,and the form of Agreement between the <br /> the time limitations contained in Subparagraph 11 5 1. Owner and Contractor <br /> 2.4.3 The Architect shall advise the Owner of anv adjustments <br /> ARTICLE 2 to previous preliminary estimates of Construction Cost indi- <br /> SCOPE OF ARCHITECT'S BASIC SERVICES cated by changes in requirements or general market conditions. <br /> 2.4.4 The Architect shall assist the Owner in connection with <br /> 2.1 DEFINITION the Owner's responsibility for filing documents required for <br /> the approval of governmental authorities having jurisdiction <br /> 2.1.1 The Architect's Basic Services consist of those desc • d over the Project. <br /> in Paragraphs 2.2 through 2 6 and any other services id tified <br /> in Article 12 as part of Basic Services,and include no9l6al strut- 2,5 BIDDING OR NEGOTIATION PHASE <br /> tural, mechanical and electrical engineering servic . <br /> 2.5.1 The Architect, following the Owner's approval of the <br /> 2. SCHEMATIC DESIGN PHASE Construction Documents and of the latest preliminary estimate <br /> i" 2.2. he Architect shall review the pro furnished by the of Construction Cost, shall assist the Owner in obtaining bids <br /> Owner ascertain the requirements of a Project and shall or negotiated proposals and assist in awarding and preparing <br /> arrive at a tual understanding of su requirements with the contracts for construction. <br /> Owner. <br /> 2.6 CONSTRUCTION PHASE—ADMINISTRATION <br /> 2.2.2 The Archite shall provi a preliminary evaluation of OF THE CONSTRUCTION CONTRACT <br /> the Owner's progr sch ule and construction budget <br /> requirements, each in to f the other,subject to the limita- 2.6.1 The Architect's responsibility to provide Basic Services <br /> tions set forth in Subp h 5.2 1. for the Construction Phase under this Agreement commences <br /> with the award of the Contract for Construction and terminates <br /> 2.2.3 The Architect all revie with the Owner alternative at the earlier of the issuance to the Owner of the final Certificate <br /> approaches to deli and constru ' n of the Project. for Payment or 60 days after the date of Substantial Completion <br /> 2.2.4 Based o he mutually agreed-u n program, schedule of the Work,unless extended under the terms of Subparagraph <br /> and constru on budget requirements, a Architect shall 103 3 <br /> prepare, lo approval by the Owner, Schem c Design Docu- 2,6.2 The Architect shall provide administration of the Con- <br /> ments c sisting of drawings and other docum is illustrating tract for Construction as set forth below and in the edition of <br /> the sr and relationship of Project components. AIA Document A201, General Conditions of the Contract for <br /> 2. The Architect shall submit to the Owner a prel inary• Construction, current as of the date of this Agreement• unless <br /> timate of Construction Cost based on current area,volum or otherwise provided in this Agreement. <br /> other unit costs. 2.6.3 Duties,responsibilities and limitations of authorin of the <br /> ES EVELOPMENT PHASE Architect shall not be restricted, modified or extended without <br /> written agreement of the Owner and Architect with consent of <br /> 2.3.1 Bas ve c Documents the Contractor, which consent shall not be unreasonably <br /> an any adjustments authonzed by the Owner in the p withheld. <br /> ALA DOCUMENT 8141 •OWNER-ARCHITECT AGREEMENT• FOURTEENTH EDITION•AIA• •©1987 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS. 1711 NEW YORK AVENUE.N W WASHINGTON.D C.20006 0141-1987 2 <br />