Orange County NC Website
Ms. Pamela Jones <br /> RE: Sheriffs Office Renovation October 27 1993 <br /> page 2 <br /> F. BASS, NIXON, KENNEDY, ENGINEERS <br /> (Mechanical/Electrical/Plumbing Design): <br /> $ 4>500 <br /> G. BNK CONSTRUCTION ADMINISTRATION: <br /> L 5 mo. X 2 trips/mo-_ <br /> 3 trips @ $300/EA 900 <br /> Bass, Nixon, Kennedy Total Fee: <br /> $ 5,400 <br /> Total Hakan/Corley ($10,340) and BNK fee: <br /> $15,740 <br /> Items of Cost Not Included: <br /> I. Printing, postage, reproduction (billed at cost) <br /> 2. Materials testing <br /> 3. Legal fees <br /> We bill on a monthly basis and payment is due by the 25th of the month of the date of the <br /> `ihvoice. <br /> We look forward to working with Orange County on this project. Please let us know if you have <br /> questions. <br /> Sin <br /> 7, <br /> cnneth E. Redfoot, .A. <br /> KER:esw <br /> hakan/corley&associates,inc. <br />