Orange County NC Website
- - - - ._ - '.' '' ,.. __ _.T:u-_• .. ita.ar +c..o�P+++Un.•.�.ao.,e.X,klx+,.'sCbi�oc�o2•k. . <br /> Article 3 , paragraph 3 . 1 . 1 : The services described in this <br /> Article 3 are not included in Basic Services, unless so <br /> identified in Article 12 , or the attached Article 12-Exhibit A, <br /> and they shall be paid for by the Owner as provided in this <br /> Agreement, in addition to the compensation for Basic Services . <br /> The services described under Paragraphs 3 . 2 and 3 . 4 shall only be <br /> provided if authorized in advance in writing by the Owner. In <br /> the opinion of the Architect, if services described under <br /> Contingent Additional Services in Paragraph 3 . 3 are required , due <br /> to circumstances beyond the Architect's control, the Architect <br /> shall notify the Owner of the need for these services and shall <br /> notify the Owner in writing prior to commencing such services . <br /> If the Owner deems that such services described under paragraph <br /> 3 . 3 are not required, the Owner shall give prompt written notice <br /> to the Architect. If the Owner indicates in writing that all or <br /> part of such Contingent Additional Services are not required, <br /> the Architect shall have no obligation to provide those <br /> services . If however, The Owner indicates that, in his <br /> opinion, the services described under paragraph 3 . 3 are required, <br /> due to circumstances within the control of the Architect, and <br /> directs such services be provided as part of Basic Services, <br /> the Architect reserves the right to furnish said services and <br /> file a claim for additional payment. <br /> Article 3 , paragraph 3 . 2 . 1 shall read : If the Owner and Architect <br /> agree that more extensive representation at the site than is <br /> described in Subparagraph 2. 6 . 5 is required, the Architect shall <br /> provide one or more Project Representatives to assist in carrying <br /> out such additional on-site responsibilities, as Additional <br /> Services. <br /> Article 3 , paragraph 3 . 3 . 3 , shall read: Preparing Drawings, <br /> Specifications , and other documentation and supporting data, <br /> (evaluating contractors' proposals deleted) and providing other <br /> services in connection with Change Orders and Construction Change <br /> Directives , provided such change orders and construction change <br /> directives are required by causes not within the control of the <br /> Architect. <br /> Article 3, paragraph 3.4.1, is deleted. <br /> Article 3, paragraph 3.4.16, is deleted. <br /> Article 5, paragraph 5.2.2 shall read: A fixed limit of <br /> construction cost has been mutually agreed upon by the Owner and <br /> the Architect, as set forth in Article 11 of this Agreement. The <br /> Architect shall be permitted to include contingencies for design, <br /> bidding and price escalation, to determine what materials, <br /> equipment component systems and types of construction are to be <br /> included in the Contract Documents to make reasonable adjustments <br /> in the scope of the Project and to include in the Contract <br /> Documents alternate bids to adjust the construction cost to <br /> the fixed limit. Any such fixed limit shall be increased in the <br /> amount of any increase in the contract sum occurring by <br /> change order after execution of the contracts for construction. <br /> -3- <br />