Browse
Search
Agenda - 08-23-1994 - VIII-G
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 08-23-94 Regular Mtg.
>
Agenda - 08-23-1994 - VIII-G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 10:10:46 AM
Creation date
3/3/2016 10:10:39 AM
Metadata
Fields
Template:
BOCC
Date
8/23/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-G
Document Relationships
Minutes - 19940823
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�o <br /> 11.2.2 Where compensation is based on a stipulated stun I nig,tX progress p2vments for Basic Services <br /> in each phase shall total the followingvR%1atm=wk)t total Basic Compensation payable: <br /> (Insert additional pbases as appropriate.) <br /> Fees shall be billed and paid monthly, based on services performed in previous month. <br /> See attached letter dated October 27, 1993 (Exhibit "B") for breakdown. <br /> Stf5&T8W%A*: rcent <br /> Dllt9igtl�BttiEl6 }t3�R0�t157fdS pe ent( /°) <br /> Construction Documents Phase: $12,200 �k '' perce %) <br /> BDd>9lcggt ent %) <br /> Construction Phase: $ 3,540 percent( ) <br /> Total Basic Compensation: $15,740 on ndred percent(100%) <br /> 11.3 COMPENSATION FOR ADDITIONAL SERVICES <br /> 11.3.1 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES,as described in Paragraph 3.2,compensation shall be com- <br /> puted as follows: <br /> Principal/Partner: $70/hr. <br /> Architect: $65/hr <br /> Mechanical Engineer: $75/hr. <br /> Electrical Engineer: $75/hr. <br /> Construction Administration: $60/hr. <br /> Drafting: $50/hr. <br /> 11.3.2 FOR ADDITIONAL SERVICES OF THE ARCHITECT, as described in Articles 3 and 12, other than (1) Additional Project <br /> Representation,as described in Paragraph 3.2,and(2)services included in Article 12 as pan of Additional Services,but excluding ser- <br /> vices of consultants, compensation shall be computed as follows: <br /> (Insert basis of compensation, including rata and/or multiples of Direct Personnel Expense for Principals and employees, and identify Principals and classify <br /> employees, if required. Identify specific services to wbtcb particular metbods of compensation apply, if necessary.) <br /> Same as 11.3.1 above. <br /> t� <br /> 11.3.3 FOR ADDITIONAL SERVICES OF CONSULTANTS, including additional structural, mechanical and electrical engineering <br /> services and those provided under Subparagraph 3.4.19 or identified in Article 12 as part of Additional Services, a multiple of <br /> one and two—tenths 1.2)times the amounts billed to the Architect for such services. <br /> (Identify specific types of consultants in Article 12, if required.) <br /> 11.4 REIMBURSABLE EXPENSES <br /> 11.4.1 FOR REIMBURSABLE EXPENSES,as described in Paragraph 10.2,and any other items included in Article 12 as Reimbursable <br /> Expenses,a multiple of one ( 1.0 )times the expenses incurred by the Architect,the Architect's <br /> employees and consultants in the interest of the Project. <br /> 11.5 ADDITIONAL PROVISIONS <br /> 11.5.1 IF THE BASIC SERVICES covered by this Agreement have not been completed within two (2) <br /> ( )months of the date hereof,through no fault of the Architect,extension of the Architect's services beyond that time shall be <br /> compensated as provided in Subparagraphs 10 3 3 and 11.3.2. <br /> 11.5.2 Payments are due and payable twenty—one ( 21 ) days from the date of the Architect's invoice. <br /> Amounts unpaid sixty ( 60 )days after the invoice date shall bear interest at the rate entered below,or <br /> in the absence thereof at the legal rate prevailing from time to time at the principal place of business of the Architect. <br /> (Insert rate of interest agreed upon.) <br /> ly per month. <br /> (Usury laws and requirements under the federal Trutb in Lending Act,similar state and local consumer credit laws and other regulations at the Owner s and Arcbi- <br /> tect s principal places of business, rbe location of the Project and elsewbere may affect the validity of this provision. Specific legal advice sbould be obtained uvtb <br /> respect to deletions or modifications,and also regarding requirements sucb as written disclosures or uvivers.) <br /> AIA DOCUMENT 0141 •OWNER-ARCHITECT AGREEMENT•FOURTEENTH EDITION•AIAa • C1987 <br /> 9 8141-1987 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE,N W.,WASHINGTON,D C.20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.