Orange County NC Website
B. STATE PERMITS REQUIRED 20 <br /> l: Doss the project involve the mining of earth products? No <br /> If so, how many cubic feet of material are expected to be <br /> excavated? <br /> Has an application for a Mining Permit been submitted to <br /> NCDRCD? <br /> Please attach map indicating expected extent of proposed <br /> activity. <br /> 2. Doss the project involve generation or storage of hazardous <br /> or toxic wastes, as identified by the Environmental <br /> Protection Agency? (A listing of all hazardous materials is <br /> available from the Planning Department) u� <br /> Describe the wastes to be generated. <br /> How much material is expected to be generated per month? <br /> Will any material be treated onsite? <br /> Volume? <br /> Will any material be stored onsite? A <br /> Volume? <br /> Where will disposal of the material take place? <br /> How will materials be transported to the disposal site? <br /> What measures are proposed to protect water quality and air <br /> quality in case of spills? <br />