Browse
Search
Agenda - 08-08-1994 - VIII-N
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 08-08-94 Regular Mtg.
>
Agenda - 08-08-1994 - VIII-N
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 11:16:45 AM
Creation date
3/1/2016 11:16:34 AM
Metadata
Fields
Template:
BOCC
Date
8/8/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-N
Document Relationships
Minutes - 19940808
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
RES-1994-036 Resolution approving Tupelo Ridge, Phase One preliminary plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 6/93 <br /> RESOLUTION <br /> OF THE <br /> ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS <br /> Date August 8, 1994 <br /> Name of Subdivision Tupelo Ridge, Phase One <br /> Owner/Applicant J. Kevin Huggins, Agent <br /> The Board of County Commissioners hereby approves Tupelo Ridge Subdivision, Phase I <br /> Preliminary Plat, dated June 12, 1994 and containing seven lots (in Orange County's <br /> jurisdiction), subject to the fulfillment of requirements specified herein. <br /> All roads shall be irrevocably dedicated to the general public and be constructed to standards <br /> of the North Carolina Department of Transportation. The approval of this resolution <br /> authorizes and directs the Orange County Manager to accept for Orange County and on <br /> behalf of the public generally, the offer of dedication of Wood-Sage Drive . This acceptance <br /> by Orange County of the dedication to the general public of Wood-Sage Drive shall be <br /> without maintenance responsibility. These roads shall be maintained by the owner/applicant <br /> until such time as they are accepted for maintenance by the North Carolina Department of <br /> Transportation or some other governmental body. Before the Final Plat of any phase of <br /> Tupelo Ridge can be recorded: <br /> A. Sewage Disposal <br /> 1. Each residential lot shall contain an adequate area for septic disposal, and <br /> repair area, approved by the Orange County Division of Environmental <br /> Health. <br /> 2. Disclosure that the septic system location may restrict the size and location of <br /> improvements. This disclosure shall be included in a document describing <br /> development restrictions to be recorded concurrently with the Final Plat. The <br /> document shall also disclose that information regarding the tentative location of <br /> septic systems is available from the Orange County Health Department, <br /> Division of Environmental Health. <br /> B. Roads and Access <br /> 1. Wood-Sage Drive shall be constructed to standards of the North Carolina <br /> Department of Transportation, within a 50-foot right-of-way, and the <br /> construction shall be inspected and approved by NCDOT. <br /> OR <br />
The URL can be used to link to this page
Your browser does not support the video tag.