Orange County NC Website
Orange County Survey Update and Manuscript Preparation, Phase II <br /> Scope of Work <br /> All work will be done to federal and state architectural survey standards and under the <br /> supervision of HPO staff in accordance with the Contract; Appendix for Contracts (Attachment <br /> B); Services to be Provided and Standards to be Followed (Attachment D), unless otherwise <br /> specified in this scope of work; and the Time-Product-Payment Schedule (Attachment E). The <br /> consultant will meet the qualifications of 36 CFR part 61. <br /> The consultant will submit all final products no later than August 19, 2016: the paper files and a <br /> hard copy of the essay and Study List presentation (text) to the HPO and copies of the <br /> database, all digital photographs, the essay, and the Study List presentation (text and <br /> PowerPoint) on a CD or DVD to the HPO and Orange County. <br /> 2 <br />