Browse
Search
Agenda - 09-19-2007-6a3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-6a3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:11:39 AM
Creation date
8/28/2008 10:59:15 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
6a3
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that activity on the Contractor's Constructioh Schedule. Time is of the essence with respect <br />to each such activity and Completion Date. <br />13.5 if the Contractor submits a construction schedule, progress report, or any other document <br />that indicates or otherwise expresses an intention to achieve completion of the Work prior <br />to any Completion Date required by the Contract Documents or prior to expiration of the <br />Contract Time, no liability of the CMAR to the Contractor for any failure of the Contractor to <br />so complete the Work shall be created ar implied. <br />13.6 If the Gontractor, for reasons beyond the Contractor's control, is delayed in beginning any <br />activity, the Contractor shall, nevertheless, have the same number of days as is shown in <br />the Master Schedule for the activity, and the affected activity and any succeeding activity <br />that is dependent upon that activity shall be adjusted accordingly; provided tha# at any time <br />the CMAR, by means of a Change Order, may require the Contractor to work overtime, to <br />increase labor farces or to take any necessary or appropriate action to decrease the time <br />required for any activity, and the Contractor shall be entitled to an adjustment in the <br />Contract Price computed in accordance with Article 15 of these General Conditions. <br />13.7 At any time, the CMAR may order the Contractor, on seven {7) days written notice, to begin <br />any activity earlier than the starting date shown on the Master Schedule. <br />13.8 Should the Contractor fail to start any activity on the start date shown in the Master <br />Schedule or as it may have been adjusted in accordance with paragraphs 13.6 or 13.7 <br />above, or become delayed, the Contractor shall, without being entitled to any increase in <br />the Contract Price or other compensatipn, work overtime, increase labor forces or take <br />such other action as may be necessary or appropriate to complete the activity by the <br />Completion Date shown on the Master Schedule, or as such Completion Date may have <br />been adjusted. <br />13.8 The CMAR shall monitor progress of the Work at all times and the Contractor shall <br />cooperate with such monitoring and provide any and all information with respect to the <br />progress of the Work and scheduling as the CMAR may reasonably require. <br />13.10 On a monthly basis, in consultation with the Contractor, the CMAR shall revise the Master <br />Schedule, showing any adjustments made in accordance with paragraphs 13.6 or 13.7, <br />above, by any Change Order, the progress of the Work, and any days gained or days lost <br />with respect to any activity, and shall furnish copies thereof to the Contractor. <br />13.11 Should any monthly revision of the Master Schedule show that the Contractor is behind on <br />any activity, the late completion of which could delay Substantial Completion of the Work, <br />the CMAR shall be entitled to withhold from the next Progress Payment due the Contractor <br />an amount sufficient to reimburse the CMAR for any and all delay damages, should <br />Substantial Completion be delayed by the same number of days that the Contractor is <br />currently behind schedule. If, subsequently, the Contractor's progress, as shown by any <br />succeeding monthly revision to the Master Schedule, is such that the anticipated delay no <br />longer exists, the CMAR shall pay with the Progress Payment next due to the Contractor <br />such amounts as have been withheld in accordance with this paragraph. <br />13.12 The CMAR shall have the right to perform Work, hire and employ labor and craftsmen, rent <br />equipment, subcontract with other parties, or do anything that the CMAR deems necessary <br />or appropriate to remedy or cure any delay by the Contractor in the progress of the Work. <br />Such action by the CMAR shall not, in any way, affect, void or limit any warranty, guaranty <br />or other responsibility of the Gontractor under the Contract Documents. Such action may <br />be taken by the CMAR only after three (3} days written notice to the Contractor. All costs <br />incurred by the CMAR in taking any such action shall be charged to the Contractor and <br />deducted from any amounts remaining due under the Agreement. <br />GENERAt_ CONDITIONS FOR CM AT RISK PROJECT 27 of 42 JUNE 2007 EDITION <br />