Browse
Search
Agenda - 09-19-2007-6a3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-6a3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:11:39 AM
Creation date
8/28/2008 10:59:15 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
6a3
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
environmental hazards, and make such changes in the Drawings andlor Specifications as <br />they may find necessary to abate, remediate, isolate or handle the environmental hazards. <br />Any increase or decrease in the Contract Price or the Contract Time resulting from such <br />changes shall be adjusted in the manner provided herein far adjustments as to extra and/or <br />additional Work and changes. It is agreed that the Contractor shall have no liability under <br />this Agreement for any environmental hazards existing at, on or in the Project site prior to <br />the date that Work commences under this Agreement unless the Contractor or its <br />Subcontractors, agents or employees, acting alone or in concert with others, by their own <br />negligence or misconduct, release or expose the Owner or third parties to the <br />environmental hazards. <br />The provisions of this paragraph 5.4 shall survive the termination or cancellation or <br />completion of this Agreement. <br />ARTICLE fi. OTHER RECORD DOCUMENTS AND SUBMITTALS <br />6.1 The CMAR shall furnish to the Contractor the number of copies of Drawings and <br />Specifications stated in the Supplementary Conditions. Additional copies of Drawings and <br />Specifications may be obtained at the cost of reproduction and handling. <br />6.2 The Contractor shall submit to the CMAR for forwarding to the Designer all Submittals <br />required by the Contract Documents. The Contractor shall submit four (4) reproducible <br />prints of al! shop drawings plus the number of copies sufficient for its requirements. The <br />Contractor shall submit samples in quantities required by the Contract Documents. The <br />Contractor shall submit product data in five (5) copies, plus the number of copies sufficient <br />far the Contractor's requirements. All shop drawings shall be reviewed by the Contractor <br />and shall bear the Contractor's stamp of approval before being forwarded to the CMAR and <br />the Designer. Submittals shall be submitted in such time as to cause na delay to the Work <br />or any part thereof and in accordance with the Contractor's Construction Schedule and <br />Submittal Register. The CMAR shall review and process the submittal with reasonable <br />promptness, noting desired corrections, if any. The CMAR shall retain three (3} copies of <br />the submittal and shall retum the balance of the reviewed submittal to the Contractor for <br />action. The Contractor shall furnish any corrected submittal to the CMAR for forwarding to <br />the Designer. The CMAR shall retain three {3) copies of the corrected submittal for the <br />records of the CMAR and the. Designer, and will return the balance of the reviewed <br />submittal to the Contractor. <br />Subject to paragraph 6.3 herein, no substitutions will be accepted after the bids have been <br />received. All substitutions prior to the receipt of bids shall be in accordance with the <br />Contract Documents. <br />The Contractor acknowledges that the processing of shop drawings and other submittals is <br />directly impacted by the clarity, completeness, and accuracy of said documents and that it <br />is the Contractor's responsibility to (i} review and coordinate each submittal with all other <br />related or affected Work and (ii) approve each submittal before submitting same to the <br />CMAR for approval, <br />6.3 No substitutions and no deviations from any requirement of the Contract Documents shall <br />be deemed allowed unless the Contractor has specifically informed the CMAR in writing of <br />such deviations at the time of submittal and the Designer and the Owner have given written <br />and specific approval to the substitu#ions or deviations. In proposing a deviation or <br />substitution, the Contractor warrants to the CMAR, notwithstanding any review, allowance <br />or approval by the Designer or the Owner, that the deviation or substitution is at least equal <br />to or better in quality and for the purpose intended, and that the Contractor shat{ not by <br />reason of any such review, allowance or approval be relieved from any obligation or <br />responsibility contained in the Contract Documents. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 16 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.