Browse
Search
Agenda - 09-19-2007-6a3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-6a3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:11:39 AM
Creation date
8/28/2008 10:59:15 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
6a3
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor in this Agreement. The Contractor shall provide a written copy of the claim or <br />alleged claim to the CMAR within three (3) days of the Contractor's receipt of the claim or <br />alleged claim. if a claim is settled to the satisfaction of the claimant, the Contractor shaft <br />submit a copy of the claimant's release to the CMAR. <br />If a claim or alleged claim is rejected by the Contractor and/or its insurance company, the <br />Contractor shall immediately report this fact to the CMAR. <br />Should thirty {30} days elapse after the claim or alleged claim has been received by the <br />Contractor, and the Contractor is not able to report a settlement or rejection of the claim, it <br />shall report to the CMAR the steps being taken with respect to the claim. <br />Without limiting the foregoing, the Contractor shall notify the CMAR in writing of any paid or <br />incurred claims which may impair annual aggregate or general liability. <br />5.1.7 Deductibles and Self-insured Retentions <br />Any deductibles orself-insured retentions must be declared to and approved by the CMAR. <br />At the option of the CMAR, either: the insurer shall reduce to a maximum of $250,000 or <br />eliminate such deductibles or self-insured retentions with respect to the CMAR, or the <br />Contractor shall provide evidence of collateral provided to insurers or procure a bond <br />guaranteeing payment of losses and related investigations, claim administration, and <br />defense expenses within the deductible or self-insured retention amount. Any self-insured <br />retention or deductible amount on the policy shalt not reduce the amount of collectible limits <br />or liability. <br />5.1.8 Subcontractors <br />The Contractor shall include all Subcontractors as Insureds under its policies, or shall <br />furnish separate certificates, policies, and endorsements for each Subcontractor the <br />Contractor intends to use. If a Subcontractor does not take out insurance in its own name <br />and the Contractor wishes to provide insurance protection for such Subcontractor and such <br />Subcontractor's employees, the Contractor shall either (a) procure appropriate policies in <br />the name of the Subcontractor, or {b) cause a rider or riders to be attached to the <br />Contractor's policies which shall identify the Subcontractor thereby covered; provided, <br />however, in the case of the latter option, such a rider need not be attached to the <br />Contractor's workers' compensation policy if such policy by its terms is sufficiently broad to <br />cover the employees of all Subcontractors performing Work under the Contract Documents. <br />Except as otherwise approved by the CMAR in writing, Limits of Liability and coverage <br />scope must be at a minimum as stringent as required of the Contractor by the Contract <br />Documents. All Wark performed for the Contractor by any Subcontractor shall be pursuant <br />to an appropriate agreement between the Gontractor and the Subcontractor which shall <br />contain provisions that waive all rights the contracting parties may have against one <br />another for damages caused by fire or other perils covered by insurance as provided <br />herein. Insurance monies received from any loss shall be divided as the respective interest <br />of the parties affected shall appear. <br />5.2 PROPERTY INSURANCE <br />The CMAR shall be responsible far purchasing and maintaining insurance to protect the <br />Project from perils of physical loss. The insurance shall provide for the cost of replacement <br />for the Work at the time of any loss. The insurance shall include as named insureds the <br />Owner, the CMAR, the Contractors and their Subcontractors and shall insure against the <br />loss from the perils of fire and all risk coverage for physical loss or damage due to theft, <br />vandalism, collapse, malicious mischief, transit, flood, earthquake, testing, damages <br />resulting from defective design, negligent workmanship or defective material. The CMAR <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 13 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.