Browse
Search
Agenda - 09-19-2007-6a3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-6a3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:11:39 AM
Creation date
8/28/2008 10:59:15 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
6a3
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The policy of insurance shall contain or be endorsed to include the following: <br />a} Blanket Contractual Liability covering Contractor's indemnification obligations <br />under this Agreement, in accordance with ISO policy fattn GG 00 01. Modifications <br />to the standard provision will not be acceptable if they serve to reduce coverage. <br />b) PremiseslOperations Liability. <br />c) Explosion, collapse, and underground fault. <br />d) Independent Contractors and Independent Subcontractors coverage. <br />e) Broad Form Property Damage. <br />f} Personallnjury. <br />g} Cross LiabilitytSeverability of Interest clause. <br />h) Employer's Stop-Gap Liability endorsement, if applicable. <br />Amendment of the Pollution Exclusion Endorsement to allow coverage for bodily <br />injury or property damage caused by heat, smoke, or fumes from a hostile fire. <br />j) Designated General Aggregate Limit Endorsement if required by the <br />Supplementary Conditions. <br />k} For contractors with design responsibility, endorsement CG22 80 and D1C for <br />contractors' professional is requested. <br />Coverage shall remain continuously in effect and without interruption for at least six (6} <br />years from the date of the Notice of Award and shall include coverage for exposures arising <br />from operations that have been completed. The Contractor shall furnish the CMAR and <br />each other addifional insured listed in the Agreement to whom the Cerkificates have been <br />issued, evidence satisfactory to the CMAR of continuation of such insurance at the date of <br />Substantial Completion and each year thereafter. <br />5.1.4 Pollution Legal Liability (PLL} <br />Pollution Legal Liability coverage will be provided if required by the Supplementary <br />Conditions. <br />5.1.5 Professional Liability <br />Policies for professional liability must be provided by the Contractor or its independent <br />design professional if the Contractor is required to provide any professional design services <br />under the Contract Documents. Alternatively, compliance with paragraph 5.1.3 (k} is <br />acceptable. The limits of coverage required for professional liability shalt be included in the <br />Contract Documents, and will be subject to approval by the CMAR, taking into account <br />among any other reasonable factors the risks insured against, the cost of the insurance, <br />and the professionals providing the insurance. <br />5.1.6 Claims <br />The Contractor shall notify the CMAR within twenty-four {24) hours of any claims or alleged <br />claims received by the Contractor covered by any of the policies of insurance required of <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 12 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.