Browse
Search
Agenda - 09-19-2007-6b1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-6b1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:10:26 AM
Creation date
8/28/2008 10:58:57 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
6b1
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Work the price of which was based on estimated quantities, <br />allowances or other conditional pricing and, when the final price <br />is determined, adjust the Guaranteed Maximum Price as <br />follows: <br />12.1.4.1 If the final adjusted price of any item or division of the <br />Work is less than the amount reflected in the approved <br />Guaranteed Maximum Price, as determined in accordance with <br />the terms of this Agreement, the amount indicated in the <br />Guaranteed Maximum Price for the cost of such item shall be <br />reduced by an amount equal to the difference between the final <br />adjusted cost and the original amount indicated in the <br />Guaranteed Maximum Price for the cost of such item, and the <br />Contingency shall be increased by the same difference. <br />12.1.4.2 If the final adjusted price of any item or division of the <br />Work is greater than the amount reflected in the approved <br />Guaranteed Maximum Price, as determined in accordance with <br />the terms of this Agreement, to the extent that the Contingency <br />is sufficient, the amount indicated in the Guaranteed Maximum <br />Price for the cost of such item shall be increased by an amount <br />equal to the difference between the final adjusted cost and the <br />original amount indicated in the Guaranteed Maximum Price for <br />the cost of such item, and the Contingency shall be decreased <br />by the same difference. <br />12.1.4.3 Regardless of the final adjusted price of any item or <br />division of the Work that differs from the amount reflected in the <br />approved Guaranteed Maximum Price, the Guaranteed <br />Maximum Price shall not be adjusted, except pursuant to an <br />approved change order. <br />12.1.5 Change of Contractor Ordered by Owner <br />If the Owner directs the CMAR to award a contract to a bidder <br />other than the lowest responsible and responsive pre-qualified <br />bidder for any potion of the Project, the Guaranteed Maximum <br />Price shall be increased by the amount of the difference <br />between the award price and the price submitted by the lowest <br />responsible and responsive bidder. <br />12.1.6 Costs in Excess of Guaranteed Maximum Price <br />In the event that the sum of the Cost of the Work exceeds the <br />Guaranteed Maximum Price and any adjustments therein as <br />may be due pursuant to the terms hereof, the CMAR shall <br />continue to perform at no additional cost to the Owner until the <br />Project, defined by this Agreement and all Attachments hereto, <br />is complete. The CMAR shall be responsible for paying all <br />costs in accordance with the terms of this Agreement that may <br />be necessary to complete the Project, even if such amounts <br />are in aggregate in excess of the Guaranteed Maximum Price. <br />This Agreement is executed the day and year first written <br />above. <br />CMAR: (Trade or Corporate Name) <br />[Address] <br />By: <br />Title: <br />(President) (Manager) <br />Attest: <br />By: <br />Title: <br />(Secretary) (Manager) (Witness) <br />OWNER: ORANGE COUNTY <br />P. O. Box 8181 <br />Hillsborough, N.C. 27278 <br />By: <br />Chairman <br />Orange County Board of Commissioners <br />Attest: <br />Clerk to the Board <br />This instrument has been pre-audited in the manner required <br />by the local Government Budget and Fiscal Control Act. <br />Orange County Finance Officer <br />This instrument is approved as to Form. <br />Orange County Attorney <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.