Browse
Search
Agenda - 09-19-2007-6b3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-6b3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:09:41 AM
Creation date
8/28/2008 10:58:18 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
6b3
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.25 Notice of Award -The written notice by the CMAR to the Contractor that the Contractor is <br />the successful Bidder and that upon compliance with the conditions precedent to be fulfilled <br />by the Contractor within the time specified, the CMAR will execute and deliver the <br />Agreement to the Contractor. <br />1.26 Notice to Proceed -See paragraph 13.3 of these General Conditions. <br />1.27 Owner -The Owner is the person designated as such in the Agreement. <br />1.28 Owner's Authorized Representative - A person, or persons, employed by the Owner and <br />designated from time to time by written notice to the Contractor to administer the Contract <br />Documents, and to observe and monitor the Work on behalf of the Owner with authority <br />and responsibility as herein specified. <br />1.29 Project -The total construction of which the Work performed under the Contract <br />Documents may be the whole or a part. <br />1.30 Project Manager -That person designated by the Contractor in accordance with paragraph <br />7.2 who shall be in general charge of the Work and its performance and who shall have the <br />authority set forth in the last sentence of paragraph 7.2. <br />1.31 Request For Information (RFI) - A written communication from the Contractor to the CMAR <br />to be forwarded to the Designer for any interpretation of, or information needed, required, <br />or desired under the Contract Documents. The CMAR reserves the right to determine the <br />reasonable format and contents required for a RFI. In any RFI, the Contractor shall state a <br />reasonable date by which a response is necessary in order to avoid delay in progress of <br />the Work and shall make such request sufficiently in advance of such date as to avoid any <br />such delay. The CMAR shall obtain a response in writing to the RFI by the date stated by <br />the Contractor unless the CMAR cannot reasonably do so, in which case the CMAR shall <br />prior to that date notify the Contractor of the date by which the CMAR can reasonably <br />respond. The Contractor shall not be entitled to any additional time for the completion of <br />the Work or any portion thereof by reason of the failure to timely respond to an RFI if the <br />Contractor has not submitted the RFI sufficiently in advance to allow the CMAR and the <br />Designer a reasonable time within which to respond. <br />1.32 Request for Payment -The form, in the form of AIA Document G702 (latest edition.) or <br />other published document approved by the CMAR, which is to be used by the Contractor in <br />requesting progress payments and which is to include a Schedule of Values as required by <br />the Contract Documents and an affidavit of the Contractor that progress payments <br />theretofore received from the CMAR on account of the Work have been applied by the <br />Contractor to discharge in full all the Contractor's obligations incurred in connection with <br />Work covered by all prior applications for payment. See paragraph 20.2 of these General <br />Conditions. <br />1.33 Resident Superintendent -That person designated by the Contractor in accordance with <br />paragraph 7.2 who has day-to-day responsibility far the prosecution of the Work and the <br />obtaining of proper materials and equipment, and adequate labor and who shall have the <br />authority set forth in the last sentence of paragraph 7.2. <br />1.34 Schedule of Values -Any breakdown of the Contract Price which may be required by the <br />Contract Documents, and designated as such. See paragraph 20.1 of these General <br />Conditions. <br />1.35 Specifications -That portion of the Contract Documents consisting generally of the written <br />requirements for materials, equipment, construction systems, standards, and workmanship <br />for the Work and performance of related services. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 5 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.