Browse
Search
2016-138 Planning - NCDOT for transit service expansion along US 70 corridor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-138 Planning - NCDOT for transit service expansion along US 70 corridor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:28:35 AM
Creation date
2/9/2016 1:47:48 PM
Metadata
Fields
Template:
Contract
Date
12/1/2015
Contract Starting Date
12/1/2015
Contract Document Type
Agreement
Agenda Item
6g
Amount
$205,162.00
Document Relationships
Agenda - 02-02-2016 - 6-g - Resolution Endorsing Congestion Mitigation and Air Quality (CMAQ) Grant Agreement with the NCDOT
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 02-02-2016 - Regular Mtg.
R 2016-138 Planning - NCDOT for transit service expansion along US 70 corridor
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Purchase of 28', 22-passenger diesel-powered transit vehicle <br /> as further set forth In this Agreement, <br /> 3. FUNDING <br /> REIMBURSEMENT FOR ELIGIBLE ACTIVITIES <br /> Subject to compliance by the County with the provisions set forth in this Agreement and the <br /> availability of federal funds, the Department shall reimburse 80% of eligible expenses incurred by <br /> the County up to a maximum amount of One Hundred Sixty Four Thousand One Hundred Twenty <br /> Nine Dollars($164,129), as detailed below, The County shall provide the non-federal match, as <br /> detailed in the FUNDING TABLE below, and all costs that exceed the total estimated cost, <br /> FUNDING TABLE <br /> Fund Source Federal Funds Reimbursement Non-Federal Non-Federal <br /> Amount Rate Match$ Match Rate <br /> ............ <br /> Congestion $164,129 80% $41,033 20% <br /> Mitigation and Air <br /> Quality <br /> Total Estimated Cost <br /> WORK PERFORMED BY NC DOT <br /> All work performed by the Department on this Project, including, but not limited to, reviews, <br /> inspections, and Project oversight, during any phase of the delivery of the Project, shall reduce <br /> the funding available to the County under this Agreement. The Department will set aside ten <br /> percent(10%)of the total estimated cost, or$16,413,to use towards the costs related to review <br /> and oversight of this Project, including, but not limited to review and approval of plans, <br /> environmental documents, contract proposals, engineering estimates, construction engineering <br /> and inspection oversight, and other items as needed to ensure the County's appropriate <br /> compliance with state and federal regulations. <br /> In the event that the Department does not utilize all the set-aside funding,then those remaining <br /> funds will be available for reimbursement to the County at the above reimbursement rate. For all <br /> costs of work performed on the Project,whether incurred by the County or by the Department, the <br /> County shall provide the non-federal match, The Department will bill the County for the non- <br /> federal match of any costs that the Department incurs on the Project and for any costs that <br /> exceed the Total Estimated Cost. <br /> Agreement ID#6119 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.