Browse
Search
2016-139-E DEAPR - ATC Associates of NC, PC for geotech services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-139-E DEAPR - ATC Associates of NC, PC for geotech services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:28:41 AM
Creation date
2/5/2016 8:46:48 AM
Metadata
Fields
Template:
Contract
Date
12/8/2015
Contract Starting Date
12/8/2015
Contract Ending Date
12/31/2015
Contract Document Type
Contract
Amount
$998.00
Document Relationships
R 2016-139-E DEAPR - ATC Associates of NC, PC for geotech services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:OAF 1 2925-8959-4001-86A5-0644A8C56FE 1 <br /> Proposal for Field Testing,and Observation Services <br /> Hollow Rock Park Parking Area,Chapel Hill,NC <br /> Earthwork <br /> • Observe the site after topsoil has been stripped to verify that objectionable soils have been removed. <br /> • Observe, document, and quantify undercut <br /> • Observe proof rolling of site prior to fill placement. <br /> • Conduct laboratory Proctor tests (ASTM D-698) on representative fill soils. <br /> • Test in-place density of fill soils to verify the percent compaction achieved by the contractor. <br /> • Report daily soils observation and testing activities to the appropriate project representatives and <br /> contractor. <br /> • Proof-roll road sub-grade prior to placement of stone base. <br /> • Perform compaction testing and measure depth of stone base. <br /> PROJECT SERVICING REQUIREMENTS <br /> Services will be provided on a full-time basis, or on-call basis, depending upon the level of construction <br /> activity. Our project manager will consult with your management team to provide the appropriate level of <br /> staffing to meet the project requirements. We request 24-hour notice prior to providing on-call services to <br /> allow us to efficiently schedule technicians. <br /> Cost estimate: <br /> CT Manager 2.0 hrs. at $85/hr: $170 <br /> Sr. Technician 16 hrs. at$45/hr: $720 <br /> Mileage 180 @ .60/mi.: $108 <br /> Total: $998 <br /> REPORTING <br /> ATC routinely uses field computers with internet and wireless technology to greatly speed reporting of <br /> field test results. ATC will file field reports to your office and to the field report distribution list in pdf <br /> format usually within two to three days of the on site visit. At the end of the project the complete set of <br /> reports will be provided on a CD-Rom disc. If paper copies are required during the course of the project <br /> they will be sent via regular mail. <br /> The cost of services will be billed on a unit rate basis in accordance with the attached fee cost of services <br /> schedule. <br /> "ATC <br /> 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.