Orange County NC Website
68 <br /> Under this scenario staff is envisioning classifying subdivisions into 2 <br /> categories: Standard and Flexible Development with classification of same <br /> as follows: <br /> a. Standard Subdivision: Minor and Major subdivision thresholds <br /> remain the same as detailed in Section 7.2 of the UDO. <br /> b. Flexible Development: Minor and Major thresholds modified as <br /> follows: <br /> 1. Minor (i.e. staff review and approval) between 1 to 12 lots; <br /> 2. Major (i.e. BOCC review and approval with Planning Board <br /> recommendation): 13 or more. <br /> iv. Staff suggests the Village Flexible Development, contained in Section <br /> 7.13.4 (C), become a Conditional Zoning district allowed within Transition <br /> Areas and Rural Neighborhood Nodes as denoted on the FLUM <br /> (Attachment 1). <br /> We believe this will provide additional opportunities for such projects to be <br /> developed and allow for a process where the BOCC and the applicant have <br /> some flexibility to work on site specific development proposals. <br /> b. Staff is continuing to re-evaluate existing roadway development requirements as <br /> contained in Section 7.8.5 of the UDO. This review includes continued discussion <br /> amongst local volunteer fire departments and Orange County Emergency Services. <br /> To date, staff has not made a determination as to the anticipated direction of our review <br /> and would appreciate any guidance from the BOCC. <br /> c. Staff is evaluating the development of a Rural Master Plan Development Conditional <br /> Zoning District (RMP-CZ) to afford the BOCC and applicants greater flexibility in <br /> addressing residential development in rural areas. <br /> As currently envisioned the RMP-CZ would provide a mechanism where residential <br /> developments in the rural areas of the County could develop a project with greater <br /> flexibility with respect to minimum lot sizes and cluster options as a uniform project. The <br /> main difference between this envisioned district and the Village Flexible Development <br /> option is the RMP-CZ would not allow for non-residential land uses. <br /> As with all Conditional Zoning districts the project would involve the negotiation of design <br /> elements between the BOCC and applicant to ensure the viability of the project. <br /> The RMP-CZ would be reviewed as a rezoning request (i.e. legislative review only) and <br /> acted upon by the BOCC in accordance with Section 2.9.2 of the UDO. <br /> Staff is not suggesting modification of existing density allotments, as contained in Section 4.2.4 <br /> of the UDO, unless specific direction is received to do so. Changing density allowances for RB <br /> zoned property will only be possible with the amendment of the Joint Planning Land Use Plan <br /> and Agreement. <br /> Please also note none of the proposed modifications being investigated by staff will include <br /> impacts to the RB general use zoning district. In order to change density or minimum lot sizes <br /> for this area of the County the Joint Planning Land Use Plan and Agreement will have to be <br /> amended, requiring the approval of all participating entities (i.e. Orange County, Chapel Hill, and <br /> Carrboro) after a joint public hearing. <br />