Orange County NC Website
Article 2: Procedur 9 <br /> 'Section 2.9.1 - Conditional Use District (CUD) I Section 2.9: Conditional Districts <br /> Applications to establish a CUD shall be submitted to the Planning Director and shall •- <br /> processed in accordance with the procedure(s)for: <br /> (1) Zoning Atlas amendment (Section 2.8), <br /> 2) Class A Special Use Permit (Section 2.7), and <br /> (3) The provisions of this Section. <br /> (C) Submi al Requirements <br /> (1) In .edition to the CUD application form, an applicant sha also submit the <br /> folio g information: <br /> (a) A .,ite plan prepared in accordance with th= provisions of Section 2.5 <br /> incl ling the following: <br /> (i) detailed description of the roposed use of property including <br /> an outline of the propose. operational characteristics of the <br /> propo ed development <br /> (ii) A detaileo raffic survey, regardless of the estimated number of <br /> trips per da , •ree.red in accordance with all applicable North <br /> Carolina Depa , ent of Transportation (NC DOT) requirements <br /> or standards .s :II as Section 6.17 of this Ordinance, <br /> (iii) The appropriate envir. mental document prepared in <br /> accor. nce with Section •.16; and <br /> (iv) A I dscape plan showing t : location of on-site significant <br /> ees; proposed screening, buf': s, and landscaping; and any <br /> proposed treatment of any existine atural features. <br /> (b) A - mmary of utility services, including proces •ng of wastewater. <br /> (c) A schedule of construction of all elements of the p ••osal; and <br /> (d) Any other information identified during the pre-applica 'en conference <br /> deemed essential to demonstrate the project's complianc: with these <br /> regulations. <br /> (2 26 copies of the application package required in (1) above shall be sub •tted by <br /> the applicant. <br /> (3) The Planning Board and/or Board of County Commissioners may request <br /> additional information in order to evaluate and properly process the application <br /> for a CUD. <br /> (D) Neighborhood Information Meeting <br /> (1) Before a Public Hearing may be held on an accepted application for a CUD, the <br /> applicant is required to schedule, with the assistance of the Planning <br /> Department, a minimum of one neighborhood information meeting. The purpose <br /> of this meeting is to obtain surrounding property owner input and comments on <br /> the proposed development project. <br /> (2) The applicant shall obtain property owner mailing address information from the <br /> Orange County Planning Department and shall mail certified notices of the <br /> meeting date and time via first class mai to each property owner within one <br /> thousand feet of the property for which a CUD has been requested. <br /> (3) The notices shall be mailed a minimum of 14 days prior to the date of the <br /> proposed Neighborhood Information Meeting. <br /> (4) The applicant shall post a sign on the property advertising the date, place, and <br /> time of the meeting a minimum of 10 days prior to the date of the meeting. <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-29 <br />