Browse
Search
Agenda - 10-23-2007-6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 10-23-2007
>
Agenda - 10-23-2007-6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:51:05 AM
Creation date
8/28/2008 10:55:56 AM
Metadata
Fields
Template:
BOCC
Date
10/23/2007
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes - 20071023
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-080 Endorsing Comments to DCHC MPO TAC Regarding Regional Priority List for 2009-2015 MTIP
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />ORANGE COUNTY UNIFIED TRANSPORTATION BOARD <br />COMMENTS REGARDING THE <br />DCHC MPO REGIONAL PRIORITY LIST FOR THE <br />2009 -2015 TRANSPORTATION IMPROVEMENT PROGRAM <br />The Orange Unified Transportation Board (OUTBoard) realizes that the ranking <br />methodology is only one tool for comparing merits of projects submitted by all <br />jurisdictions. However, the board is concerned that the methodology used is flawed in <br />accurately reflecting the merits the projects, especially for bicycle and pedestrian <br />projects. <br />For example, bicycle and pedestrian project travel demand points are awarded for <br />proximity to travel destinations, and connectivity points are awarded for connectivity to <br />other bicycle or pedestrian facilities, and not for connectivity between desired <br />destinations. This process leaves out points that would indicate the need and priority <br />for connectivity between longer distance destinations, such as between municipalities or <br />for phased bicycle or pedestrian facilities that would ultimately connect with other <br />planned bicycle or pedestrian facilities. <br />Orange County's number 1 priority, TIP Project E-4980 to construct a pedestrian bridge <br />on Orange Grove Road over I-40, should also receive travel demand points as a bicycle <br />project since the bridge will be used by both pedestrians and bicyclists. This bridge <br />connects to the Orange Grove Road Elementary School but is not connected by an <br />existing bike bath at the present because any bike path would currently dead end at I- <br />40 The distance between the proposed bridge and the school is minimal and would <br />certainly be covered by a bike path. <br />Orange County's projects in the Regional Priority List should reflect the priority of those <br />projects in the local priority list. <br />
The URL can be used to link to this page
Your browser does not support the video tag.