Browse
Search
Agenda - 10-23-2007-4m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 10-23-2007
>
Agenda - 10-23-2007-4m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:55:28 AM
Creation date
8/28/2008 10:55:02 AM
Metadata
Fields
Template:
BOCC
Date
10/23/2007
Document Type
Agenda
Agenda Item
4m
Document Relationships
Minutes - 20071023
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
ORD-2007-217 -Amendents to the Soil Erosion and Sedimentation Control Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~a <br />Orange County SE & SC Ordinance September 12, 2006 <br />C. Ground Cover <br />Whenever land-disturbing activity is undertaken on a tract comprising more than <br />20,000 square feet, if more than 20,000 square feet are uncovered, the person <br />conducting the land-disturbing activity shall install such sedimentation and erosion <br />control devices and practices as are sufficient to retain the sediment generated by the <br />land-disturbing activity within the boundaries of the tract during construction upon <br />and development of said tract, and shall plant or otherwise provide a permanent <br />ground cover sufficient to restrain erosion after completion of construction or <br />development. Except as provided in Section 8 (D) (2) (e) of this ordinance, provisions. <br />for a ground cover sufficient to restrain erosion must be accomplished within 15 <br />working days or 90 calendar days, whichever period is shorter, following completion <br />of construction or development. <br />D. Design and Performance of Control Measures <br />1. Design Storm <br />2. Standards for High Quality Waters <br />E. Prior Plan Approval <br />F. The land-disturbing activity shall be conducted in accordance with the approved <br />erosion and sedimentation control plan. <br />Section 8.1 Additional Standards for Land-Disturbing Activity in University Lake, <br />Cane Creek, and Upper Eno Watersheds <br />Channeling Runoff <br />Alteration of Watercourses <br />Limit Land-Disturbing Activity <br />Land Alterations <br />Wetland Protection <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.