Browse
Search
Agenda - 10-23-2007-4m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 10-23-2007
>
Agenda - 10-23-2007-4m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:55:28 AM
Creation date
8/28/2008 10:55:02 AM
Metadata
Fields
Template:
BOCC
Date
10/23/2007
Document Type
Agenda
Agenda Item
4m
Document Relationships
Minutes - 20071023
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
ORD-2007-217 -Amendents to the Soil Erosion and Sedimentation Control Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County SE & SC Ordinance September 12, 2006 <br />SECTION 7 BASIC CONTROL OBJECTIVES <br /> <br />A. Identify Critical Areas <br />B. Plan for Erosion Control <br /> <br />C. Limit Exposed Areas <br />D. Limit Time of Exposure <br />E. Control Surface Water <br /> <br />F. Control Sedimentation <br /> <br />G. Manage Stormwater Runoff <br />H. Open Burning <br />SECTION 8 P/I~ANDATORY DESIGN AND PERFORIVJ[ANCE STANDARDS <br />FOR LAND-DISTURBING ACTIVITY <br />A. Buffer Zone <br />B. Graded Slopes and Fills <br />The angle for graded slopes and fills shall be no greater than the angle which can be <br />retained by vegetative cover or other adequate erosion control devices or structures. In <br />any event, slopes left exposed will, within 21 calendar days of completion of any <br />phase of grading, be planted or otherwise provided with ground cover, devices, or <br />structures sufficient to restrain~erosion. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.