Browse
Search
2016-119-E AMS - Tibbens Construction for Board of Elections renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-119-E AMS - Tibbens Construction for Board of Elections renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:22:37 AM
Creation date
1/25/2016 2:18:26 PM
Metadata
Fields
Template:
Contract
Date
1/19/2016
Contract Starting Date
1/19/2016
Contract Ending Date
2/15/2016
Contract Document Type
Contract
Amount
$16,600.00
Document Relationships
R 2016-119-E AMS - Tibbens Construction for Board of Elections renovations
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 13936B85-84DF-43F8-8F41-517DO73AODA8 <br /> Estimmatt; <br /> ........................................................................................................................................................................................................................ <br /> FROM: Tibbens Construction _ Page. No. 1 of 1 <br /> 849 Moose Tracks Trl .Cedar Grove NC. <br /> 27231 919-643-2856 c# 919-667-5366 <br /> PROPOSAL SUBMITTED TO: <br /> Name: Orange Co. Board of Elections ATTPaul Sorrell W/Asset managment <br /> Phone: 919-245-2625 Cell# 919-201-6829 <br /> Street: 208 South Cameron Street <br /> City: Hillsborough NC. 27278 <br /> 1 propose to furnish all materials and perform all labor necessary to complete the following: <br /> Renovations to the south wing of building as discussed at site visit. <br /> Remove existing suspended ceilings and reinstall new ceiling using existing components and <br /> ceiling tile as needed. <br /> All ceiling lights, ceiling fans etc. will remain in existing locations. <br /> Remove and dispose of masonry partition walls, doors etc. patch and paint remaining walls as <br /> needed with color to match existing as close as possible. <br /> All receptacles, data etc. of existing walls remaining will stay. <br /> All receptacles, data etc. at partition walls removed will be deleted or relocated as discussed at <br /> site visit. <br /> Remove two existing store front door units and reinstall one at end of existing hall leading to <br /> site. <br /> All of the work is to be completed in a substantial and workmanlike manner for the sum of <br /> ($16,600.00). Payment to be made each week as the work progresses to the value of One <br /> hundred percent (100%) of all work completed. The entire amount of the contract is to be paid <br /> within 5 days after completion. <br /> Any alterations or deviation from the above specifications involving extra cost of material or <br /> labor will be executed upon written order for same, and will become an extra charge over the <br /> sum mentioned in this contract. All agreements must be made in writing. <br /> Authorized Signature Mark Tibbens <br /> ACCEPTANCE- Owners Signature <br /> www,socrates.com Page 1 of 2 SS4301-340-Rev.05/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.