Orange County NC Website
BDi1K ~ ~~~ o;'.GE 1~~ 69 <br />Bicycle paths throughout. <br />- Open, grassed play area. <br />- Adequate night lights for safety and security reasons. <br />_ Appropriate landscaping. <br />c. Provide 10 parking spaces to serve the above activities within the 15 acre <br />recreation area. <br />d. Along either side of Nancy Hill Creek, designate 100 ft. as open space/passive <br />areas with walking and hiking paths. Provide public walkways (to be part of <br />the designated open space area") to these areas from both Graham Drive 'and <br />•Cameron Circle. Install bridges across the creek at either end and midway, in <br />conjunction with the public walkways. A pedestrian and non-motorized vehicle <br />easement shall be dedicated cote~7r-inous with the open space area. <br />e. Multi-family recreation facilities are to include an open grassed area and a <br />picnic area (i.e., tables, trash receptacles, grills). <br />f. Provide 13 parking spaces to serve the multi-family recreation facilities. <br />g. Install a fence around the pool for safety reasons: <br />h. Provide handicapped parking spaces and ramps within the parking facility for <br />the recreation area. The location of those spaces and ramps shall be approved <br />by the Zoning Officer and shown on the revised site plan. Construct all <br />walking and bicycle paths on slopes no greater than 5%n. <br />28. All plans for, drainage, sail erosion and sedimentation control shall be reviewed and <br />approved by Orange County and the site flan modified accordingly to satisfy the Soil <br />and Erosion specifications. In addition, Orange County shall inspect the installation of <br />control devices and the on-going work for the total project. The project shall at all <br />times meet the requirements of the Orange County Soil Erosion and Sedimentation <br />Control Ordinance. <br />29. Construct and maintain stormwater devices to control the peak rate of runoff from the <br />commercial and multi-family tract. The detention devices shall be designed and <br />constructed so that the pew aft 24-hourost arm and forostorms of grc terxintensit}, pre- <br />development rate fora 2~ ye <br />30. Grading on the site shall.be kept to a minimum. Existing vegetation shall be <br />maintained between units. Clearing shall only be conducted for purposes of installing <br />roads, utilities and other improvements until the improvements have been installed and <br />the developthree or fewer lot ~RPasonable care should beltpken to ~etain all existing <br />purchasing <br />