Orange County NC Website
BOCK ~~~~ Pt;r,E ~~5 <br />67 <br />maintained as constructed. All such improvements and facilities shall further 'be <br />maintained and operated in a safe manner. <br />6. Left and right turn lanes shall be provided on St. Mary's Road at proposed Graham <br />Drive during the development of Phase I. <br />7. Graham Drive and Hamilton Way shall have a 60' right-of--way with a 41' paved cross <br />section. <br />8. Turn lanes to the east and west shall be constructed on Graham Drive at the <br />intersection with St. Mary's Road during the construction of Graham Drive during the <br />development of Phase L <br />9. Curb and gutter shall be provided along all street`s. <br />10. A sidewalk shall be provided o dicae ed at street intersect onsll streets in the PD-H-R2 <br />zone with curb cuts for the han pp <br />11. Scotswood Boulevard shall have a 90 foot right-of-way, containing a 65 foot cross <br />section with 24 foot wide pavement widths and a 12 foot median. <br />12. Left turn lanes shall be installed on Scotswood Boulevard into the multi-family and <br />commercial areas during the development of Phase II-A: <br />13. The radii of the driveway off ScktSa cess aBnd shall be approved by the Zoning Officer <br />be reworked to allow easier truc <br />and shown on the revised site plan. <br />14. A cul-de-sac. shall be constructed at the southwestern end of Carolina Avenue during <br />the development of Phase I. The entrance on St. Mary's Road (SR 1002) shall be <br />closed by governmental action, which action shall be initiated upon the effective date <br />of this special use permit. <br />15.. A stubout to the western property line shall be prov~hed outhern cm'neroof Greentree <br />This stubout shall be located to connect drrectly to <br />Drive. The location of the stubout shall be approved by the Zoning Officer and shown <br />on the revised site plan. <br />16. Temporary turnarounds shall be provided at all stub-out streets. <br />17. A third turn lane shall be constructed along US 70 between St. Mary's Road and <br />Millcr Road (SR 1555) during the construction of Phase I. <br />18. Left turns onto or out of the southernmost entrancde to the commercial area shall be <br />restricted and only right turn movements permute <br />