2016-112-E DEAPR - W.L. Bishop - Change Order to 2015-499-E for wet soil
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-112-E DEAPR - W.L. Bishop - Change Order to 2015-499-E for wet soil
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:21:32 AM
Creation date
1/14/2016 8:46:09 AM
Metadata
Fields
Template:
Contract
Date
1/8/2016
Contract Starting Date
9/19/2015
Contract Ending Date
1/29/2016
Contract Document Type
Contract Amendment
Amount
$44,421.00
Document Relationships
2015-499-E DEAPR - W. L. Bishop to construct Hollow Rock parking area
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
R 2016-112-E DEAPR - W.L. Bishop - Change Order for wet soil
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E4349D49-1523-4646-AC79-1BC3F4B5D445 <br /> 2725 E. Millbrook Road, Suite 121 <br /> Raleigh, North Carolina 27604 <br /> www, ssociates.COM <br /> C .-...........atca <br /> Phone: 919-871-0999 <br /> ATC Associates, Inc. Fax: 919-871-0335 <br /> DAILY REPORUPROJECT OBSERVATIONS <br /> Project Name: Hollow Rock Parking lot ATC Rep: R. Whitley <br /> Client: Orange Co. ATC Job No.: WLBISHP01 1 <br /> Location: Chapel Hill Day/ ate: 11-23-15 <br /> 'Arrival Time: 11:00 'Departure Time: 11:30 Weather/Temp: 65 clear <br /> 2Arrival Time: 2Departure Time: Equipment: <br /> Onsite Time: .5 Travel Time: 1.25 No. of Trips: 1 <br /> Lab Time: .25 10.75 2.0 Mileage: 60 <br /> A. Description of Work:-undercut evaluations <br /> B. Location Grid Coordinates & Floor Level: <br /> C. Tests Performed: <br /> D. Equipment and Crew: <br /> E. Problems/ Non-Compliance/Failing Tests: <br /> F. Informed of E above: <br /> ATC Construction Services Manager arrived on site as requested, and met with reps. from Orange Co., and <br /> the general and grading contractors to observe the proposed parking area, where unsuitable plastic wet clays <br /> exist in the lower half of the lot. The area was probed and advised undercutting these soft wet materials <br /> tapering from .5' to approx. 2' in the lower sides. A test pit was dug in the hill in front of the lot, with soils too <br /> wet for use as structural fill. The contractor will import fill form an approved borrow source. ATC will return to <br /> monitor and quantify the undercut. <br /> Printed Name: I Rob Whitley Reviewed By: Ben Wilson, PE <br /> This Report is Preliminary until reviewed by the engineering staff. Field Data, Locations, Elevations and Depths are Estimated. <br /> This report is a summary of field observations and is subject to review by ATC personnel.Therefore,the information provided herein does not constitute <br /> certification or approval unless specifically stated. <br />