Browse
Search
2016-111-E DEAPR - Gateway Building Company for shelter construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-111-E DEAPR - Gateway Building Company for shelter construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:20:59 AM
Creation date
1/13/2016 2:11:51 PM
Metadata
Fields
Template:
Contract
Date
1/7/2016
Contract Starting Date
1/7/2016
Contract Ending Date
3/15/2016
Contract Document Type
Agreement - Construction
Amount
$68,398.00
Document Relationships
R 2016-111-E DEAPR - Gateway Building Company for shelter construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 5D99AC7B-FD9F-4A53-8F87-6D72739989E9 <br /> [Departmental Use Only] <br /> TITLE W10 Shelter <br /> FY 2016 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT(hereinafter called"Agreement"), made as of the 7th day <br /> of January, 2016, by and between Gateway Building Company, (hereinafter called the "Contractor"), and <br /> Orange County, a body politic and a political subdivision of the State of North Carolina, (hereinafter <br /> called the"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b, Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall turnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Procced to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if ffilly contained herein: <br /> a. Construction Drawings prepared by Lysaght& Associates and Marabeth Carr, RLA (Sheet <br /> I of I and not numbered dated 1/4/2016 and 12/1/2015) <br /> b. Written specifications prepared by the project engineer. <br /> c. Orange County Bid #1716 Erect Picnic Shelter on Existing Concrete Pad at the Soccer <br /> Center, and Gateway Building Company proposal dated January 6, 2016 which fully <br /> describes the work to be performed, such work(hereinafter called the"Work"). <br /> d. Related documents listed under Section I above. <br /> Revised 10114 . 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.