Browse
Search
2016-110-E AMS - Tile Restoration, Inc. for floor restoration in multiple facilities
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-110-E AMS - Tile Restoration, Inc. for floor restoration in multiple facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:20:44 AM
Creation date
1/13/2016 2:05:39 PM
Metadata
Fields
Template:
Contract
Date
1/13/2016
Contract Starting Date
1/12/2016
Contract Ending Date
2/15/2016
Contract Document Type
Contract
Amount
$7,760.00
Document Relationships
R 2016-110-E AMS - Tile Restoration, Inc. for floor restoration in multiple facilities
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:07BFB95E-8BDF-4FA6-BB33-lD1B1EEA787C <br /> SaniGLAZE <br /> I <br /> WK TOUK SUKISS.081-STEP ROSY 11000.1X0. <br /> 0 id Your Flooring <br /> rMe Solution Resource <br /> �p www.tilerestorationinc.coni pure performonce <br /> 1 I< <br /> 119 East Main Street <br /> »:, file.,.,,,r;:;,t XOEi4e" <br /> Hookerton, NC 28538 <br /> t, ' <br /> Sustainable Flooring System Phone: 866-327-4600 <br /> Freddy Brooks Phone: 919-245-2636 Date: 12/30/2015 <br /> Orange County Public Works Rep.: Brad Albritton <br /> 600 Highway 86 North Fax: 919 644 3043 Cell : 252-916-2045 <br /> Hillsborough, NC 27278 Email: fbrooks @orangecountync.gov Fax: 1-252-376-1452 <br /> Email:brada @tilerestorationinc.com <br /> Process Description of Area-Courthouse Price <br /> 1 SaniGLAZE GroutGLAZE 2nd Floor Tile around carpet and Stairnell Steps $3,285.00 <br /> Proposal Includes: <br /> Removal of contamination from tile and grout surface <br /> Prep to grout lines for restoration <br /> Application of Non Porous Resin#251 Wheat <br /> A Fee of 2.5%will be added for all Credit Card Transactions <br /> Terms: Net 20 Days TOTAL $3,285.00 <br /> Please Remit All Contracts,PO's and Payments To: <br /> Tile Restoration Inc. 119 East Main St PO Box 160 Hookerton NC 28538 <br /> Proposal Valid for 30 Days Delivery to Job,Sales Tax and Installation are included. <br /> All services guaranteed as specified.All work to be complete in a workmanlike manner according to standard practices.Any alteration or deviation from this proposal <br /> involving extra costs will be executed only upon writen orders,and will become an extra charge over and above the proposal. All agreements contingent upon strikes, <br /> accidents or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. <br /> Our workers are fully covered by Workman's Compensation Insurance. Evidence of Insurance will be provided upon request.Any special requirements or endorsemenis may <br /> incur additional charges. <br /> We do not waive any rights of subrogation against contractor or owner for any loss covered by insurance of any type. <br /> All Tile Restoration services require a minimum of 72 of cure time before they can be exposed to moisture.If this fimeline is not adhered to the customer laces full <br /> responsibility for any damage or performance issues that may result. <br /> San1GLAZE Restoration Service Is warranted against material defects and workmanship and extends indefinitely as long as the Ev xGLAZE Program as prescribed Is Incorporated In the ongoing <br /> ce. <br /> maintenan gazing compound colors on color chart represent actual Glaring compound material.Once applied,colors may vary depending on original grout color,porosity and other factors." <br /> Tile Restoration Will take all precaution to protect adjoining flooring,walls,materials etcetera from exposure to rater andlor chemicals.Any damage that may occur from contact from water and/or <br /> chernical is not the responsibility of Tile Restoration Inc.and it staff.Any changes or additional work required <br /> or requested by the owner,will be done at an additional charge and must be written.I hereby give Tile Restoration Inc.authorization to do the work specified and payment Yell be made as outlined <br /> above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.