Browse
Search
2016-103-E AMS - BIRS, Inc. for courthouse roof upgrade
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-103-E AMS - BIRS, Inc. for courthouse roof upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:18:24 AM
Creation date
1/6/2016 11:18:55 AM
Metadata
Fields
Template:
Contract
Date
12/11/2015
Contract Starting Date
12/20/2015
Contract Ending Date
1/30/2016
Contract Document Type
Contract
Amount
$10,875.00
Document Relationships
R 2016-103-E AMS - BIRS, Inc. for courthouse roof upgrade
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AEE43C90-CC92-4D5D-A539-7CAD61B8867F <br /> ORANGE COUNTY - COURTHOUSE 11/24/2015 <br /> ROOF LEAKS JUDGES CHAMBERS #217 AND #208 <br /> THIS PHOTO IS THE FRONT LEFT OF FOUR END <br /> WALLS WHERE LEAKS OCCUR ON THE INSIDE <br /> °l WALL AND RUN DOWN EACH WALL INTO THE <br /> ROOMS OF#208 AND#217. <br /> THE INSIDE BRICK WALL AND THE CONCRETE <br /> COPING HAVE BEEN DETERMINED TO BE THE <br /> SOURCE OF WATER ENTRY FOR EACH OF THE <br /> LEAKS, TIIE ORANGE ARROW POINTING UP IS <br /> ' THE WALL AND THE ARROW POINTING DOWN IS <br /> THE CONCRETE COPING. <br /> RECOMMENDATIONS; <br /> CLEAN AND SEAL WITH ENVIROSEAL DOUBLE 7 <br /> A WATER-BASE CLEAR SILANE COATING <br /> APPLIED TO THE EXPOSED BRICK ON THE INSIDE <br /> WALL,END WALL AND CHIMNEY. <br /> WE WILL ALSO SEAL THE OUTSIDE WALL DOWN <br /> TO THE TOP OF THE FIRST SET OF WINDOWS ON <br /> THE OUTSIDE WALL, <br /> INSTALL COPPER COPING. THE NEW METAL <br /> COPING WILL BE INSTALLED OVER THE <br /> EXISTING CONCRETE COPING AND WILL COVER <br /> THE CAULK JOINT THAT SEALS THE CONCRETE <br /> COPING TO THE TOP OF THE BRICK WALL. <br /> (COPING CAP 90 FT.) <br /> (WALL COATING APPROXIMATELY 975 SQ,FT.) <br /> NOTE: THE PROJECT HAS FOUR WALLS AND <br /> TWO CHIMNEYS JUST LIKE THE WALL AND <br /> CHIMNEY IN THIS PHOTO. <br /> NOTE: THE ABOVE WORK WILL BE SCHF,DUI.ED <br /> FOR WEEKENDS. <br /> NOTE: SAFTEY WILL ALSO BE ATOP PRIORITY <br /> DURING THE INSTALL, <br /> YOUR INVESTMENT COST FOR THE ABOVE <br /> IS .......... $10,875 <br />
The URL can be used to link to this page
Your browser does not support the video tag.