Browse
Search
2015-662-E Solid Waste - W.L. Bishop Construction Co. storage building construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-662-E Solid Waste - W.L. Bishop Construction Co. storage building construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 10:34:32 AM
Creation date
1/5/2016 4:11:33 PM
Metadata
Fields
Template:
Contract
Date
12/14/2015
Contract Starting Date
12/14/2015
Contract Ending Date
3/31/2016
Contract Document Type
Agreement - Construction
Amount
$177,839.00
Tags
5-year Retention
Document Relationships
R 2015-662-E SW - W.L. Bishop Construction Co. - new storage building construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:46276B05-79E0-4089-B879-E62E97F0B2A1 <br /> Attach to Bid Attach to Bid Attach to Bid Attach to Bid Attach to Bid Attach to Bid Attach to Bid Attach to Bid <br /> State of North Carolina AFFIDAVIT A-Listing of Good Faith Efforts <br /> County of nit- ,. - <br /> (Name of Bidder) <br /> Affidavit of (...+-1 <br /> I have made a good faith effort to comply under the following areas checked: <br /> Bidders must earn at least 50 points from the good faith efforts listed for their bid to be <br /> considered responsive. (1 NC Administrative Code 301.0101) <br /> iii 1—(10 pts)Contacted minority businesses that reasonably could have been expected to submit a quote and <br /> that were known to the contractor,or available on State or local government maintained lists,at least 10 days <br /> before the bid date and notified them of the nature and scope of the work to be performed. <br /> /' 2—(10 pts)Made the construction plans,specifications and requirements available for review by prospective <br /> minority businesses,or providing these documents to them at least 10 days before the bids are due. <br /> e 3—(15 pts)Broken down or combined elements of work into economically feasible units to facilitate minority <br /> part cipation. <br /> 0 4—(10 pts)Worked with minority trade,community,or contractor organizations identified by the Office of <br /> Historically Underutilized Businesses and included in the bid documents that provide assistance in <br /> recruitment of minority businesses. <br /> yo 5—(10 pts)Attended prebid meetings scheduled by the public owner. <br /> Eli B—(20 pts)Provided assistance in getting required bonding or insurance or provided alternatives to bonding <br /> or insurance for subcontractors. <br /> $ 17—(15 pts)Negotiated in good faith with interested minority businesses and did not reject them as <br /> unqualified without sound reasons based on their capabilities. Any rejection of a minority business based on <br /> lack of qualification should have the reasons documented in writing. <br /> 0 B—(25 pts)Provided assistance to an otherwise qualified minority business in need of equipment,loan <br /> capital,lines of credit,or joint pay agreements to secure loans,supplies,or letters of credit,including waiving <br /> credit that is ordinarily required. Assisted minority businesses in obtaining the same unit pricing with the <br /> bidder's suppliers in order to help minority businesses in establishing credit. <br /> 9—(20 pts)Negotiated joint venture and partnership arrangements with minority businesses in order to <br /> increase opportunities for minority business participation on a public construction or repair project when <br /> possible. <br /> jZ/ 10-(20 pts)Provided quick pay agreements and policies to enable minority contractors and suppliers to <br /> meet cash-flow demands. <br /> The undersigned, If apparent low bidder,will enter into a formal agreement with the firms listed in the <br /> Identification of Minority Business Participation schedule conditional upon scope of contract to be <br /> executed with the Owner. Substitution of contractors must be in accordance with GS143-128.2(d) <br /> Failure to abide by this statutory provision will constitute a breach of the contract. <br /> The undersigned hereby certifies that he or she has read the terms of the minority business <br /> commitment and is authorized to bind the bidder to the commitment herein set forth. <br /> Date: /2�2 Name of Authorized Officer <br /> ��!�i Signature: r <br /> Title: e6' <br /> • <br /> ' State of M�l C. <br /> ,county of � �;7�:�r:�..:r <br /> — Subscribed and sworn to before met,this =� day of u`)c 20 VP <br /> Notary Public Tht`: ' � ., ti . ; .AL-"N. <br /> C. <br /> y expires ��,c,w,�. .. <br /> � M commission ex �' <br /> /// (is'C O `r1`\` <br /> MBForms 2 -Revised July 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.