Browse
Search
2015-662-E Solid Waste - W.L. Bishop Construction Co. storage building construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-662-E Solid Waste - W.L. Bishop Construction Co. storage building construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 10:34:32 AM
Creation date
1/5/2016 4:11:33 PM
Metadata
Fields
Template:
Contract
Date
12/14/2015
Contract Starting Date
12/14/2015
Contract Ending Date
3/31/2016
Contract Document Type
Agreement - Construction
Amount
$177,839.00
Tags
5-year Retention
Document Relationships
R 2015-662-E SW - W.L. Bishop Construction Co. - new storage building construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:46276B05-79E0-4089-B879-E62E97F0B2A1 <br /> FORM OF PROPOSAL (Revised) <br /> Solid Waste Storage Building Contract: <br /> Orange County Bidder: (.01. 1,... Thm,y0 <br /> PO Box 8181 Hillsborough, NC 27278 Date: /2—3--(s <br /> The undersigned, as bidder, hereby declares that the only person or persons interested in this proposal as <br /> principal or principals is or are named herein and that no other person than herein mentioned has any interest in <br /> this proposal or in the contract to be entered into; that this proposal is made without connection with any other <br /> person, company or parties making a bid or proposal; and that it is in all respects fair and in good faith without <br /> collusion or fraud. The bidder further declares that he has examined the site of the work and the contract <br /> documents relative thereto, and has read all special provisions furnished prior to the opening of bids; that he has <br /> satisfied himself relative to the work to be performed. <br /> The Bidder proposes and agrees, if this Proposal is accepted, to contract with the Owner in the form of contract <br /> specified,to furnish all necessary materials, equipment, machinery,tools, apparatus, means of transportation and <br /> labor necessary to complete all construction of the subject project in accordance with the Drawings,Specifications, <br /> and Contract Documents, to the full and entire satisfaction of the Owner and the Architect, with a definite <br /> understanding that no money will be allowed for extra work, except as set forth in the General Conditions and <br /> Contract Documents for the sum of: <br /> SINGLE PRIME CONTRACT: <br /> Estimated <br /> Description Unit Unit Price Total Cost <br /> Quantity <br /> New Storage Building LS 1 0 /69 <br /> Electronic Waste Loading Dock LS I 9 7o0 ,•%'" <br /> Allowance: Undercut excavation, <br /> disposal, and replacement with #57 CY 100 " <br /> 93 <br /> stone on geotextile fabric. <br /> Allowance: Undercut excavation, <br /> disposal and replacement with select <br /> borrow material classified as SW, SP, CY 100 4 laim et, <br /> SC, or CL obtained from Contractor <br /> supplied off-site borrow area. <br /> Total Base Bid Price: <br /> fe R39. .1' <br /> Dollars($) /93 <br /> In Words) <br /> General StiTCOntlteter: Plumbing Subcontractor: <br /> 63.L.raZSVicR, Lic 51141 1 Lic <br /> Mechanical Subcontractor: Electrical Subcontractor: <br /> 14 1 Pr Lic Gj6 Lic ,Lk5-31) <br /> GS143-128(d)requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is <br /> accepted shall not substitute any person as subcontractor in the place of the subcontractor listed in the original bid, except(i)if the listed <br /> subcontractor's bid is later determined by the contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter <br /> into a contract for the complete performance of the bid work,or(ii)with the approval of the awarding authority for good cause shown by the <br /> contractor. <br /> The bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in a written order of the <br /> designer and shat fully complete all work thereunder within the time specified in the General Conditions Article 13. Applicable liquidated <br /> damages amount is also stated in the General Conditions Article 13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.