Browse
Search
Agenda - 10-09-2007-6g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 10-09-2007
>
Agenda - 10-09-2007-6g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:43:56 PM
Creation date
8/28/2008 10:50:48 AM
Metadata
Fields
Template:
BOCC
Date
10/9/2007
Document Type
Agenda
Agenda Item
6g
Document Relationships
Minutes - 20071009
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
S Purchasing - Bid Award Lechase Construction Services LLC
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Dixon <br />Weinstein <br />.. ~ F ~ ? <br />w1s. Pc~melo K loner, Director <br />Orange Co~rnty Purchasing rind Central Ser•~ices <br />129 Enst King Street <br />Hillsborough, NC ~??78 <br />HAND DELIVERED <br />Dear Pam. <br />`;ept. I ~ 2CiO' <br />The bid opening for construction of the Orange County Solid Waste Operations Center <br />concluded September 13. 200?, with proposals from four general contr-actor-s. We have <br />reviewed the proposals and recommend award of the contact to the low bidder, LeChase <br />Construction Services. LLC, as follows: <br />Base Bid $2,227,900. <br />Altemate I -deduct (,24.630.) <br />Altemate 2 -deduct (35, 180.) <br />Altemate 3 - no change 0. <br />Alternate 5 - no change 0. <br />:: ~ :• - •~ ~~ TOTAL $2, 168,090. <br />_.,, _ ,. The recommended Alternates I ,2,3 and 5 .provide for various uses of wood material reclaimed <br />from buildings Orange County has deconstructed in recent years. The only Alternate not <br />recommended for acceptance, Alt. 4, required reclaimed wood as structural members in <br />engineered wood roof trusses. Based on conversations with amanufacturer-, we do not believe <br />.. ... ••~•~ commercial truss makers will agree to engineer, manufacture and accept liability for roof trusses <br />~_+', =~ made of reclaimed wood. <br />---- I have enclosed a copy of the recommended bidder's Proposal Form as well as an updated <br />- Appendix B indicating MBE participation in the project. <br />• "' Also enclosed is the certified bid tabulation, which indicates the next lowest bid was from <br />•° - Harrod and Associates. Their Base Bid of X2,5 19,000 and deductions totaling $8.500 for- <br />. Alternates I ,2.3 and 5. yielded a proposed price of X2.5 10,500. <br />Sincerely, <br />~~~~~~~ <br />Ken Friedlein. AIA <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.