Browse
Search
Agenda - 10-09-2007-4l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 10-09-2007
>
Agenda - 10-09-2007-4l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:47:27 PM
Creation date
8/28/2008 10:49:38 AM
Metadata
Fields
Template:
BOCC
Date
10/9/2007
Document Type
Agenda
Agenda Item
4l
Document Relationships
Minutes - 20071009
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: October 9, 2007 <br />Action Agenda <br />Item No. <br />SUBJECT: Resolution Endorsing Two NCDOT Projects to Enhance Safety and Improve Traffic <br />Flow <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) ~__ <br />ATTACHMENT(S): <br />Resolution of Endorsement <br />Location Map of Proposed Projects <br />Letters from Division 7 Engineer <br />INFORMATION CONTACT: <br />Karen Lincoln, 245-2594 <br />Craig Benedict, 245-2592 <br />PURPOSE: To consider a resolution endorsing two transportation improvements proposed by the <br />North Carolina Department of Transportation (NCDOT). <br />BACKGROUND: Pursuant to North Carolina General Statutes Chapter §136-11.1, NCDOT <br />Division 7 Engineer has notified Orange County of two transportation improvements that have been <br />approved for Spot Safety funding by the NCDOT Division 7 Board of Transportation member. The <br />NCDOT requests that Orange County submit a written resolution expressing the County's views on <br />each project. <br />NCDOT Division 7, with help from the Board of Transportation member Douglas Galyon, has <br />accelerated the two projects shown in the location map on page 3. Those projects were chosen <br />because abenefit/cost analysis of areas having high crash rates or recurring accidents of a specific <br />type indicated the proposed improvements would yield highest benefits at these locations. The <br />proposed improvements have proven effective far enhancing safety and improving traffic flow in <br />areas having similar geometric designs. <br />FINANCIAL IMPACT: There is no direct financial impact associated with this item. <br />RECOMMENDATION(S): The Manager recommends that the Board approve the Resolution <br />Endorsing Safety Improvements to Enhance Safety and Improve Traffic Flow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.