Browse
Search
Agenda - 12-07-2015-13 (5) - Information Item - Memo Regarding Mebane Comprehensive Transportation Plan Project Including the Mattress Factory Road Interchange
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 12-07-2015 - Regular Mtg.
>
Agenda - 12-07-2015-13 (5) - Information Item - Memo Regarding Mebane Comprehensive Transportation Plan Project Including the Mattress Factory Road Interchange
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2015 9:46:14 AM
Creation date
12/4/2015 9:24:12 AM
Metadata
Fields
Template:
BOCC
Date
12/7/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
13-5
Document Relationships
Minutes 12-07-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION ITEM 1 <br /> PLANNING & INSPECTIONS DEPARTMENT <br /> Craig N. Benedict, AICP, Director <br /> Administration ,. 131 W. Margaret Lane <br /> (919) 245-2575 Suite 201 <br /> (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 <br /> www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 <br /> Jima— <br /> MEMORANDUM <br /> TO: Board of County Commissioners <br /> Bonnie B. Hammersley, County Manager <br /> FROM: Abigaile Pittman, Transportation/Land Use Planner <br /> Craig Benedict, Planning Director <br /> CC: OUTBoard <br /> DATE: November 18, 2015 <br /> SUBJECT: INFORMATION ITEM – Mebane Comprehensive Transportation Plan <br /> Project Including the Mattress Factory Road Interchange <br /> On November 5t" the City of Mebane released a Request for Proposals (RFP) to <br /> engage a qualified private engineering and design firm or team for transportation <br /> planning services for a Comprehensive Transportation Plan (CTP). The project scope of <br /> services includes developing a comprehensive program of transportation improvements <br /> over a 10 to 20 period, including facilities, recommendations, and alternatives for the <br /> Mebane transportation system. Included in the scope of the project is the Mattress <br /> Factory Road interchange, located both in Orange County's and Mebane's jurisdictions. <br /> In November 2012 an Interchange Analysis and Corridor Study was completed for <br /> Mattress Factory Road. The report was a preliminary feasibility study to determine the <br /> effects of a potential interchange on the roadway network immediately surrounding the <br /> interchange. The scope of the study provided a conceptual interchange design, which <br /> included roadway configuration and potential right-of-way needs. Orange County staff <br /> has had concerns about the impact of the conceptual connections to the County's <br /> economic development area to the east, and has been suggesting that this design be <br /> re-visited. <br /> Inclusion of the Mattress Factory Road interchange in this current project evolved in part <br /> from joint discussions earlier this year. In June, Planning staff met with City of Mebane <br /> staff to review Orange County's interest in working with Mebane to identify and protect <br /> future interchange access from Mattress Factory Road. The County has been <br />
The URL can be used to link to this page
Your browser does not support the video tag.