Orange County NC Website
16 <br /> September 9, 2015 <br /> Page 6 <br /> Plan approved by the Orange County Board of Commissioners, you are <br /> committing to building all the infrastructure up front; <br /> A phase line now appears on sheet C3.0, with Phase 1 being the entrance <br /> road and all lots west of the first intersection, and Phase 2 being the <br /> remainder of the proposed lots. <br /> 2. Provide an Landscape and Lighting Plans to demonstrate compliance with <br /> UDO Landscape requirements (e.g. street trees and between lot plantings) <br /> and Lighting requirements; <br /> A landscape and lighting plan, sheet C8.0 has been added to the <br /> submittal set. The lighting portion consists only of a note stating that per <br /> the UDO lighting shall be designed and provided by Duke Energy and that <br /> they will submit the proper plans prior to construction of any light <br /> fixtures. <br /> 3. Provide details and dimensions for the mail kiosk and bump out; and Provide at <br /> note regarding signage for subdivision (e.g. "Signage for the development <br /> shall comply with UDO Section 6.12: Signs"). <br /> The draft NCDOT detail for a mail kiosk bump out on a public street is <br /> now included on sheet D4.0. That is all that is available at this time. Prior <br /> to construction, we will coordinate with NCDOT on the bump-out design if <br /> they have not yet released a final detail. <br /> 4. Please reference comments in the attached email, dated July 23, 2015, by <br /> Jeff Scouten of Orange County Solid Waste Management. <br /> See comments below. <br /> Orange County Solid Waste Management <br /> 1. Plan Sheet C1.0 (Cover Sheet) -Add the following standard OCSW notes: <br /> [construction waste notes removed from comment for brevity] <br /> The indicated notes have been added to the cover sheet. <br /> 2. Plan Sheet C3.0 (Site Plan) - The minimum radius for each of the 2 proposed cul-de- <br /> sacs needs to be 43' 6" (effective 44') to the face of curb in order for the County's <br /> recycling trucks to get around them without having to make backing movements <br /> and/or 3 point turns. The radius as shown on the plan appears to be 35' to the face <br /> of curb. <br /> Per discussions with staff(and based on previously approved designs used in <br /> Orange County), four 20' wide public access shared drives (two at each cul-de- <br /> sac) have been added to give Solid Waste's trucks sufficient space to perform <br /> a 3-point turn using those drives plus the standard NCDOT 35' radius cul-de- <br />