Orange County NC Website
14 <br /> September 9, 2015 <br /> Page 4 <br /> 6. Illustrate the end of the Shakori Trail right-of-way and beginning of access <br /> easement to serve norther lots; <br /> Any access easement overlap with the new (public) Shakori Trail has been <br /> removed. The access easement now begins at the Erwin Road right-of- <br /> way ends at the cul-de-sac bulb. Although unpaved past the intersection <br /> with "Road B" the public right-of-way continues up to the northern <br /> boundary of the site. <br /> 8. Consider tapering EOPs/curb to transition to the above private drive; <br /> The pavement now shown tapering over a length of 50' from the roadway <br /> width down to the 12' width of the existing gravel private drive. <br /> 9. Indicate surfacing for access easements (paved//gravel?); <br /> The pavement in the area of the former access easement remains gravel <br /> past the "T" turnaround at "Road B". <br /> 10. It was Planning staffs understanding that a gate would be installed on <br /> Shakori Trails for access and Emergency Services access, but there is no <br /> gate depicted on the site plan. Please add the gate along with mention of a <br /> means of access for emergency services; <br /> A gate is now shown towards the Erwin Road end of the access <br /> easement. It is located 60' past the Erwin Road right-of-way line. <br /> 11. Detail more definitively the storm drainage easements; <br /> The area for the storm drain easements is now shaded in an effort to make <br /> them stand out more. They are still somewhat obscured on the 100 scale <br /> site plan but they do appear clearly on all of the 40 scale plan and profile <br /> sheets. I think this is the best we can do. <br /> 12. Show which sidewalks are ADA accessible and maximum grades; and <br /> The plan and profile sheets now indicate (at the bottom of the profile) the <br /> areas where the sidewalk meets ADA requirements. Slopes are shown at <br /> the road centerline and are the same at the sidewalk except where it is <br /> indicated that the sidewalk slope meets ADA requirements (5% or less) <br /> while the centerline slope is greater. <br /> 13. Define amenities planned around pond area (a gazebo and community <br /> garden were envisioned in the concept plan). <br /> The gazebo, garden and play area amenity near the mail kiosk has been <br /> indicated on sheet C8.0, the Landscape and Lighting plan. It is more <br />