Orange County NC Website
• LEED Gold Rockingham County Judicial Center <br /> • Rowan County Satellite Jail <br /> • Sampson County Detention Center <br /> • Stanly County Detention Center Expansion <br /> • Stokes County Jail Expansion <br /> • LEED Silver Transylvania County Public Safety Facility <br /> • Wayne County Satellite Jail Facility <br /> Process to Date <br /> • Design "Charge" <br /> • Stakeholder Survey and Direct Interview Input <br /> • Jail Personnel <br /> • Courts, Justice <br /> • Law Enforcement <br /> • Jail Alternatives Professionals <br /> • Staff <br /> • Elected Officials <br /> • Final Jail Program, Schematic Design Options <br /> • Concepts needing Board feedback <br /> Charge & Stakeholder Input: Major design issues to address <br /> 1. Protect safety of officers, staff, inmates and the public <br /> 2. Design for staff efficiency— great sightlines into housing units <br /> 3. Provide for alternative programs to help reduce inmate recidivism <br /> 4. Design to "normalize"the interior where possible (non-institutional) <br /> 5. Cost— both initial capital outlay and life cycle costs need to be reconciled <br /> 6. Maintenance resilience — look at ease of maintenance — quality systems <br /> 7. Reduce utility/energy consumption — creative energy-efficient strategies <br /> 8. Allow for ease of future growth / expansion <br /> Key Elements of Jail Program <br /> • 146 bed Jail with a 250 bed "core" <br /> • Prefer "indirect podular" supervision with option to use "direct" supervision if desired <br /> • Magistrate and Hearing Room Space <br /> • Ample multi-purpose and classroom space for inmate programs <br /> • 1 maximum security male unit— 12 beds <br /> • 1 medium/maximum security flexible use unit (female, special population, mental <br /> health, etc.) —22 beds <br /> • 1 medium/maximum security juvenile/flexible unit— 8 beds <br /> • 1 segregation/flexible unit— 8 beds <br /> • 1 minimum security male/flexible dormitory—24 beds <br /> • 3 general population male units —24 beds each <br /> Option A-Spindle 1st Floor <br /> Option A-Spindle Mezzanine (2nd Floor) <br /> Option B Rear Chase Single Floor <br />