Browse
Search
Agenda - 11-17-2015 - 6a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 11-17-2015 - Regular Mtg.
>
Agenda - 11-17-2015 - 6a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 4:29:30 PM
Creation date
11/12/2015 4:24:35 PM
Metadata
Fields
Template:
BOCC
Date
11/17/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 11-17-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> 1 * Orange-Alamance Connector (US 70 Mid-day service) <br /> 2 * Efland-Hillsborough Commuter Loop <br /> 3 <br /> 4 Unfunded Potential Expansion <br /> 5 * OPT Staff Plan-$202,124 annual additional operating (based on incremental hourly <br /> 6 costs): <br /> 7 o Expand US 70 Mid-day to Durham <br /> 8 o Add Reverse Loop to Hillsborough Circulator <br /> 9 o Hillsborough Circulator Saturday service <br /> 10 o Extend Route 420 Peak to Cedar Grove <br /> 11 o Saturday US 70 service <br /> 12 * Potential Additional-$368,928 annual additional operating (based on incremental hourly <br /> 13 costs): <br /> 14 o Daily service—rural route deviation zones <br /> 15 o Additional demand-response-seniors <br /> 16 * Total potential fleet size: 29 <br /> 17 <br /> 18 Service Plans <br /> 19 * Planned services are appropriate service types given densities and trip patterns. <br /> 20 * Performance measures to be used to monitor implementation <br /> 21 * Consideration of unfunded potential expansion based on ridership <br /> 22 <br /> 23 Organizational Options <br /> 24 * Add transit planner job function <br /> 25 * Keep transit in Planning and Inspections, or <br /> 26 * Move transit into Asset Management Services, or <br /> 27 * Create a new separate transit department, or <br /> 28 * Consolidate with another provider. <br /> 29 Transit as Separate Department (flow chart) <br /> 30 <br /> 31 Summary Comments <br /> 32 * Fleet, compliance, facilities significantly improved <br /> 33 * Staffing role key-need for transit planning/grants management functions <br /> 34 * Shift to broader role with more fixed-route, route-deviation general public services is well <br /> 35 underway <br /> 36 * With a larger operating program, organizational options need to be considered <br /> 37 * Need to monitor performance of new services <br /> 38 * Marketing and public information needed <br /> 39 * Unmet needs—existing and expanded resulting from demographic changes, may <br /> 40 require more services <br /> 41 <br /> 42 Contact: <br /> 43 Fred Fravel <br /> 44 KFH Group, Inc. <br /> 45 4920 Elm Street, Suite 350 <br /> 46 Bethesda, MD 20814 <br /> 47 301-951-8660 <br /> 48 ffravel@ kfhgroup.com <br /> 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.