Orange County NC Website
h. Access: access to the project shall be through a single access point on <br /> Frazier Road. No additional vehicular access points shall be developed. <br /> i. Parking: all vehicles shall be parked in designated areas as identified on <br /> the site plan. A total of 70 parking spaces shall be provided for residents <br /> and their guests. <br /> 4. The applicant shall be required to obtain final approval for the proposed <br /> dumpster pad location from Orange County Solid Waste prior to the <br /> commencement of earth disturbing activity. <br /> 5. The applicant shall be required to obtain stormwater and erosion control permits <br /> from Orange County Erosion Control prior to the commencement of earth <br /> disturbing activity. <br /> 6. The applicant shall be required to obtain a driveway permit from the North <br /> Carolina Department of Transportation prior to the commencement of earth <br /> disturbing activity. <br /> The applicant shall provide the Orange County Planning Department with a copy <br /> of this permit. <br /> 7. The applicant shall be required to obtain final approval for the location and <br /> access of a central mail kiosk providing mail service to local residents by the <br /> Postmaster General in consultation with the North Carolina Department of <br /> Transportation and County Planning staff. <br /> The applicant shall provide the Orange County Planning Department with a copy <br /> of any documentation from the Postmaster General and/or the Department of <br /> Transportation of this approval. <br /> 8. The applicant shall be required to obtain building permits from the Orange <br /> County Inspections Department prior to the commencement of construction <br /> activity. <br /> 9. The applicant shall be required to obtain sign permits from the Orange County <br /> Planning Department in accordance with the provisions of the Orange County <br /> Unified Development Ordinance. <br /> 10.The Orange County Fire Marshal shall review and give final approval to road <br /> layout and construction methodology prior to the initiation of land disturbing <br /> activities. The Fire Marshal shall also review and approve the final location of the <br /> emergency fire access roadway and location of the proposed stand-pipe prior to <br /> installation. <br /> 11.The Orange County Fire Marshal shall review and give final approval to proposed <br /> water lines prior to the initiation of land disturbing activity. The ultimate required <br /> size of said lines serving the project shall be based on the results of the <br /> application, which shall include water flow test data for the project. <br /> 12.The applicant shall be required to maintain all required land use buffers in <br /> perpetuity in accordance with the requirements of Section 6.8 of the .Orange <br /> County Unified Development Ordinance. <br /> 13.Required landscaping for residences located within the village area of the project, <br /> as denoted on the approved site plan, shall be installed prior to the issuance of a <br /> Certificate of Occupancy for each individual residential structure or the proposed <br /> common house. <br />