Orange County NC Website
YEAR 4 CAPITAL PROJECTS DRAFT2 <br />LOCATION PROJECT DESCRIPTION ESTIMATED COST <br />HES Basketball oats re laced $30,000 <br />HES Renovate m floor $50,000 <br />NHES Sidewalk re lacement $15,000 <br />NHES Celin renovation $20,000 <br />PES Perimeter fencin $30,000 <br />ALSMS Track resurfacin $15,000 <br />CWSMS Parkin lot and drivewa resurfacin $40,000 <br />GHMS Additional security cameras $16,000 <br />GHMS Fencing around sediment ponds $10,000 <br />GHMS 8th Grade athletic program equipment $50,000 <br />GHMS Storage building $10,000 <br />GHMS Locker room benches $1,500 <br />GHMS Track upgrades ~ $4,000 <br />CRHS Dust Removals stem Wood Sho $15,000 <br />CRHS Rubberized track surface $60,000 <br />CRHS G m floor reconditionin $5,000 <br />DISTRICT Pla round E ui ment $15,000 <br />DISTRIGT IAQ Monitor $4,000 <br />DISTRICT Mold Monitor $6,000 <br />DISTRICT Vehicle Safet Partitions 10 EA $5,000 <br />DISTRIGT Re-Ke Central Office Buildin $7,500 <br />DISTRICT Emer enc Electrical Hooku for Central Office $3,000 <br />DISTRICT Technolo U rades $650,000 <br />DISTRICT Central Office $2,500,000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> TOTAL $3,562,000 <br />9/19/2007 2010-2011 Page 5 <br />