Orange County NC Website
YEAR 8 CAPITAL PROJECTS DRAFT2 <br />LOCATION PROJECT DESCRIPTION ESTIMATED COST <br />CPES Lower la round shelter $15,000 <br />CES Drains a im rovements $10,000 <br />GABES Walkwa Between GAGES and CRHS $16,000 <br />ALSMS G m bleachers motorization $25,000 <br />ALSMS Football field irri ation s stem $20,000 <br />ALSMS Erosion control $15,000 <br />CWSMS H draulic lift $12,000 <br />GHMS Hydraulic lift $12,000 <br />GHMS Ticket booth $500 <br />GHMS Flag poles (Athletic fields) $3,000 <br />CRHS Hydraulic lift $12,000 <br />CRHS Soccer and lacrosse field $200,000 <br />CRHS Field House $500,000 <br />OHS Replace cafeteria doors $12,000 <br />OHS Hydraulic lift $12,000 <br />OHS Softball field irrigation system $5,000 <br />OHS Wrestling mat $8,000 <br />DISTRICT H draulic Lift $13,000 <br />DISTRICT Technolo U rades $650,000 <br /> <br /> <br /> TOTAL $1,540,500 <br />9/19/2007 2014-2015 Page 9 <br />