Browse
Search
2015-588-E AMS - Muter Construction Magistrate's roof restoration
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-588-E AMS - Muter Construction Magistrate's roof restoration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 12:12:14 PM
Creation date
11/11/2015 8:07:47 AM
Metadata
Fields
Template:
Contract
Date
11/2/2015
Contract Starting Date
10/1/2015
Contract Ending Date
12/31/2015
Contract Document Type
Agreement - Construction
Amount
$50,592.00
Document Relationships
R 2015-588-E AMS - Muter Construction to provide services to restore roof at Magistrate's office
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A45C1 1 C6-3162-44FB-82E4-F3B430644D4E <br /> L— Mu r, UCH MUTER11 <br /> 0 100 N.Arendell Ave. CONSTRUCTION <br /> Iebulon,NC 27597 <br /> Orange County <br /> August 13,2015 Muter Construction Orange Count <br /> 100 N.Arendell Ave. Hillsborough,NC <br /> Iebulon,NC 27597 <br /> Sum of work Proposed: . <br /> S C III ..III. <br /> Scope of work is as follows: <br /> Remove and demo of the deteriorated wood outside structural beams keeping the joist and existing roof intact. Cut <br /> deteriorated joist end and scab on new treated lumber to ends. Replace with new LVL beams.Install new treated <br /> 1x8 boxing trim around the new LVL beams. Remove the existing columns and re use for new structure. Leaving <br /> the shoring intact. Once new structure is intact remove the shoring and remove the'I'&G ceiling and replace with <br /> new T&G ceiling.Replace all trim with exact match to existing. <br /> Add: Painting all new work 53,240.00 <br /> Add:To use KDAT lumber 5651.00 <br /> Add:To use Western Cedar 4—6 week lead time 57,746.00 <br /> Add:Walk way protection 52,375.00 <br /> I ",IN C1 u IlSY)ti : <br /> • Roofing <br /> • Masonry work <br /> • Iron or steel work <br /> • Painting <br /> Proposal of Vork for Orange County -August 93,2013 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.