Browse
Search
Minutes 09-29-2015
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2015
>
Minutes 09-29-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 2:40:10 PM
Creation date
11/9/2015 2:35:30 PM
Metadata
Fields
Template:
BOCC
Date
9/29/2015
Meeting Type
Schools
Document Type
Minutes
Document Relationships
Agenda - 09-29-2015 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 09-29-2015 - Joint Mtg. - School Boards
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Discussion ensued. <br /> Commissioner Rich asked if there is a plan for the relocation of students, while parts of <br /> Chapel Hill High School are being torn down. <br /> Todd LoFrese said this will be a challenge. He said as the design process proceeds, <br /> there will be a better idea of how to address this issue. <br /> Commissioner Rich asked if Todd LoFrese could give a rough estimate of the number of <br /> students to be displaced. <br /> Todd LoFrese said this is unknown at this time. <br /> Commissioner Jacobs referred to Commissioner Dorosin and James Barrett's <br /> conversation. He said built into this process are assumptions. He said it might be helpful to <br /> look at some of these built in assumptions as the process goes forward. <br /> James Barrett said he agreed. <br /> Tom Forcella said utilizing space more effectively and efficiently is an important area that <br /> should be focused on. <br /> Commissioner Price referred to OCS, and said she is looking at the quality of education <br /> provided, and the need to upgrade the science rooms. She said it might be preferable to build a <br /> wing rather than do renovations. She said many schools might not have room to expand. She <br /> said she is also concerned about the unfunded media center at Hillsborough Elementary. She <br /> asked if there is an idea as to what is on the horizon. <br /> Pam Jones said as the assessment was put together, the core of the buildings was <br /> considered and it is imperative to take care of what already exists. She said roof work, <br /> infrastructure, and HVAC work needs to be upgraded as soon as possible, and thus are a <br /> priority. <br /> Commissioner Price said she is talking about long-term issues. <br /> Steve Halkiotis said there has never been enough money to maintain schools' <br /> infrastructure, HVAC and roofs. He said everything has been added on over the years, and <br /> these issues have been around for a long time. He reiterated that there is over$600 million <br /> value in the schools, but only $200,000 to take care of them all. <br /> CHCCS <br /> Key Elements of Older Facility Recommendations <br /> (included in the 2015-25 CIP Recommendation) <br /> • The recommendations are for a comprehensive program that focuses on the district's <br /> ten oldest schools that accommodate almost 50% of district students. <br /> • Facility recommendations include: <br /> • Correction of building code violations; <br /> • Improved safety by consolidating operations and controlling entry; <br /> • Indoor air quality deficiencies and health concerns addressed; <br /> • Replacement of malfunctioning mechanical equipment; <br /> • Relief of traffic congestion problems; <br /> • Deconstruction of some inefficient buildings; <br /> • Extending the life of the schools. <br /> • Implementation of the recommendations eliminate mobile classrooms (also in need of <br /> renovations) while providing additional student capacity. <br /> • Elementary school capacity increase = 555. <br /> • High school capacity increase = 230 +/- <br /> • Increased student capacity would result in deferment of new elementary school and <br /> high school additions well beyond the ten-year CIP window. <br />
The URL can be used to link to this page
Your browser does not support the video tag.